Laserfiche WebLink
<br />CJ <br />....) <br /> <br />(~_.; <br /> <br />00 <br />Q) <br />...... <br /> <br />. <br /> <br />. <br /> <br />NEED FOR CRITERIA <br /> <br />STRUCTURAL ELEMENTS <br />MORE THAN 100 STORAGE PROJECTS PREVIOUSLY STUDIED IN THE BASIN. <br />CONSULTANT WILL PERFORM MAP STUDY AND IDENTIFY ADDITIONAL STORAGE SITES. <br /> <br />NON-STRUCTURAL ELEMENTS <br />SEVERAL ELEMENTS WILL BE IDENTIFIED WHICH HAVE POTENTIAL TO REDUCE DEMANDS. <br />SEVERAL EXCHANGE PLANS WILL BE IDENTIFIED AND CONSIDERED. <br /> <br />ALTERNATIVE PLANS <br /> <br />SEVERAL ALTERNATIVE PLANS CONSISTING OF COMBINATIONS OF ELEMENTS WILL BE <br />FORMULATED TO MEET EXISTING AND FUTURE DEMANDS. <br /> <br />BOTTOM LINE <br /> <br />AN AGREED UPON, COMPREHENSIVE CRITERIA IS REQUIRED TO RANK ELEMENTS AND <br />ARRIVE AT PREFERRED ALTERNATIVES. <br /> <br />A CRITERIA IS REQUIRED TO RANK ALTERNATIVE PLANS TO ARRIVE AT PREFERRED <br />PLANS TO BE STUDIED IN MORE DETAIL IN PHASE II. <br /> <br />A COMPREHENSIVE CRITERIA AND RANKING PROCEDURE IS REQUIRED TO DEMONSTRATE <br />THAT ALTERNATIVE PLANS WERE EVALUATED USING AN UNBIASED AND RATIONAL <br />APPROACH. <br /> <br />A COMPREHENSIVE CRITERIA AND RANKING PROCEDURE WILL FACILITATE OBTAINING <br />REQUIRED PERMITS IN FUTURE PHASES. <br />