Laserfiche WebLink
<br />nG2312 <br /> <br />- 15 - <br /> <br />TABLE E-26 <br /> <br />ESTHiATED PERCENTAGE BREAKDOiVN <br />OF TOTAL PROJECT COST <br /> <br />. <br /> Item Percent of Total Cost <br />, Payroll 30% - 35% <br /> Equipment ~/ 15% - 18% <br /> L\aintenance, repair and 12% - 15% <br /> operation of equipment <br /> Permanent ::aterials 25% - 30% <br /> Overhead 2% - 12~; <br /> <br />aj <br /> <br />Includes interest, insurance, taxes, and depreciation. <br />total equipment cost, 2 percent is estimated as taxes, <br />as insurance, and 6. percent as interest. <br /> <br />Of the <br />2 percent <br /> <br />Source: Rhoades, I,. C., Licensed Engineer, Horner & Switzer, <br />Construction Company, Denver, August, 1951. <br /> <br />. <br />