Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />j <br />I <br />I <br />I <br /> <br />Green Mountain <br /> <br />Date Release Release w/o Release for Acre- feet <br /> w/CROS (efs) CROS (efs) CROS (efs) <br />5/30/97 875 800 75 149 <br />5/31/97 1111 800 311 6]7 <br />6/1/97 1282 800 482 956 <br />6/2197 1461 1000 461 914 <br />6/3/97 1478 1008 470 932 <br />TOTAL 3,568 <br /> <br />Dillon <br /> <br />Denver Water participated in the Coordinated Reservoir Operations study process, however, no releases <br />from Dillon Reservoir were made during 1997. Dillon Reservoir was prepared to make bypasses, but it <br />was determined that they would not have been passed through Green Mountain Reservoir due to capacity <br />limitations at the Green Mountain Reservoir Hydropower Plant. <br /> <br />Williams Fork <br /> <br />Date Release Release w/o Release for Acre- feet <br /> w/CROS (cfs) CROS (efs) CROS (efs) <br />6/2/97 369 238 131 260 <br />6/3/97 451 238 213 422 <br />6/4/97 473 369 104 206 <br />6/5/97 480 451 29 58 <br />TOTAL 946 <br /> <br />Wolford Mountain <br /> <br />Date Release w/CROS Release w/o Release for Acre-feet <br /> (cfs) CROS (cfs) CROS (cfs) <br />S/30/97 143 143 143 284 <br />S/31/97 501 501 501 994 <br />6/1/97 873 873 873 t,732 <br />612/97 982 982 982 1,948 <br />6/3/97 992 992 992 1,968 <br />6/4/97 970 970 970 1,924 <br />6/5/97 901 901 901 1,787 <br />TOTAL 10,637 <br /> <br />Wolford Mountain Reservoir was full and spilling all inflow during the time that Coordinated Reservoir <br />Operations were occurring. <br /> <br />Granbv <br /> <br />Reservoir operators for Northern Colorado Water Conservancy District participated in the Coordinated <br />Reservoir Operations study process, however, no releases from Granby Reservoir were made during] 997 <br />as there was no need for additional water due to the high flows at the time. <br /> <br />12 <br />