Laserfiche WebLink
<br />All of these options deserve to be given a full and fair airing by the EP A, the Department of <br />Interior, in Congress, at the local government level, and through the Romer-Schoettler process. <br />Bibliograpby <br />. Arnie Butler and Company, Basic Data and Valuation Range Analyses for the San Juan Basin <br />Land and Water Value Study, Piedra River, Pine River, Florida River, Animas River, LaPlata <br />River, Montezuma Valley Irrigation, and the Dolores Project (July 1997). <br />. Department of the Interior, Analysis of Seven Options prepared for the Romer-Schoettler <br />Process (December 12, 1997). <br />. Salt River Pima-Maricopa Indian Water Rights Settlement Act. <br />. Final Report, Water Supply Study for the City of Durango. Gronning Engineering Company. <br /> <br />14 <br />