My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08189
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:28 PM
Creation date
10/12/2006 2:48:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.130.10
Description
Grand Valley Unit - Colorado River Basin Salinity Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1986
Title
Information Sheet -- Lateral Improvement Program - Stage Two Development - Grand Valley Unit Colorado River Basin Salinity Control Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />INFORMATION SHEET <br /> <br />July 1986 <br /> <br />LATERAL IMPROVEMENT PROGRAM <br />STAGE TWO DEVELOPMENT <br />GRAND VALLEY,UNIT, COLORADO RIVER BASIN SALINITY CONTROL PROJECT <br /> <br />1. WHAT IS THE GRAND VALLEY UNIT? <br /> <br />The Grand Valley Unit is a component of the Colorado River Basin <br />Salinity Control Project. Its purpose is to reduce the salt added to <br />the Colorado River annually as a result of conveyance system seepage <br />and agricultural practices. The salt contribution is estimated at <br />about 580,000 tons annually. The unit was authorized for <br />construction by the Colorado River Basin Salinity Control Act of 1974 <br />(Public Law 937'320). Provisions of that law were later amended by <br />Public Law 98-569~ enacted in October 1984. <br /> <br />Z. WHAT IS STAGE TWO OF THE LATERAL IMPROVEMENT PROGRAM? <br /> <br />Unlined laterals served by the Mesa County and Palisade Irrigation <br />Districts and by the Grand Valley Irrigation Company will be replaced <br />with pipe to reduce seepage and in turn reduce salt loading to the <br />Colorado River. In most cases, this pipe would he placed on existing <br />alignments; in other cases, existing laterals might be combined into <br />fewer laterals. The laterals served by the Orchard Mesa Irrigation <br />District are included in the Stage Two plan; however, they are not <br />scheduled for construction untit about the year 2000. Two of the <br />five lateral areas served by the Grand Valley Irrigation Company are <br />also scheduled for construction starts in the out years 1997 and 1998 <br />(the Grand Valley Mainline Canal laterals and the Independent <br />Ranchmen's Ditch laterals, respectively). <br /> <br />3. WHAT IS MEANT BY THE TERM uLATERAL"? <br /> <br />Reclamation has defined a lateral as any water conveyance from the <br />districts' or company'g main canals that serves two or more people or <br />traverses more than one ownership. Under Colorado law, a lateral is <br />defined as a side ditch or conduit (as distinguished from a main <br />ditch) which has its headgate in the main ditch, not in a natural <br />water course. <br /> <br />4. UNDER THE PRIVATE LATERAL IMPROVEMENT PROGRAM, WHO WILL ASSUME <br />RESPONSIBILITY FOR THE OPERATION AND MAINTENANCE OF THE IMPROVED <br />LATERALS? <br /> <br />The Colorado River Basin Salinity Control Act requires that <br />non-Federal entities assume the responsibility for operatIng and <br />maintaining the improved laterals. Reclamation is proposing that the <br />Grand Valley Irrigation Company and the Mesa County and Palisade <br />Irrigation Districts operate and maintain the laterals ser....ed by <br />their systems pursuant to contracts that will be executed with <br />Reclamation. <br /> <br />5. WHY IS IT PREFERABLE THAT THE IM.PROVED LATERALS BE OWNED, <br />OPERATED, AND MAINTAINED BY THE IRRIGATION COMPANY AND DISTRICTS? <br /> <br />11'<)1: <br /> <br />Considering the large number of lateral users and owners, it would be <br />impractical for the Federal Government to enter into a contract with <br />each one individually. A more efficient and effective way of <br />administering the program would be to contract with the irrigation <br />company and districts who deliver the irrigation water to the <br />,la.terals and who are therefore familiar with the overall irrigation <br />...... <br /> <br />system. Also, since the laterals will be placed in pipe, special <br />maintenance equipment will be required. It will be more efficient to <br />have the irrigation company and districts provide the equipment to <br />perform the maintenance and annual inspection activities. <br /> <br />6. WILL EACH LATERAL USER BE REQUIRED TO PARTICIPATE IN THE LATERAL <br />IMPROVEMENT PROGRAM? <br /> <br />This decision will be the responsibi.lity of the irrigation company <br />and districts, and it will be made on a case-by-case basis. <br /> <br />7. WHO WILL BEAR THE COSTS FOR IMPROVING THE LATERAL SYSTEMS? <br /> <br />As authorized by Congress, the Federal Government will bear the full <br />construction costs of the lateral improvement program for the benefit <br />of salinity reduction in the Colorado River. <br /> <br />8. WHO WILL ASSUME THE COSTS FOR ANY ADDITIONAL OPERATION AND <br />MAINTENANCE EXPENSES? <br /> <br />Reclamation will also assume any additional operation and maintenance <br />costs beyond the normal operation and maintenance ~xpenscs for the <br />existing lateral systems. <br /> <br />9. AT CONSIDERABLE EXPENSE, SOME FARMERS HAVE ALREADY HADE NUMEROUS <br />IMPROVEMENTS TO THEIR LATERAL SYSTEMS, INCLUIHNG LINING WITH <br />CONCRETE. UNDER THI:: GRAND VALLEY SALltHTY CONTROL PROGRAM, WILL <br />RECLAMATION DECIDE WHAT ADDITIONAL IMPROVEMENTS NEED TO RE MADE? FOR <br />EXAMPLE, WILL EXISTING CONCRETE-LINED LATERALS BE PLACED IN PIPE? <br /> <br />Where laterals have already been lined or placed in pipe and are <br />effective in reducing seepage, new laterals would not be installed. <br />Where they are not effective in reducing seepage; for instance, where <br />concrete laterals have deteriorated, they would be replaced. <br /> <br />10. WHO WILL OWN THE IMPROVED LATERALS? <br /> <br />The irrigation company and districts will own the improved laterals. <br />but they will not have title to the land itself. However, an <br />easement will be required for construction and maintenance of the <br />improved laterals. <br /> <br />11. WILL THIS PROGRAM INTERFERE WITH IRRIGATION WATER DELIVERY? <br /> <br />'No. Irrigation water delivery will not be interfered with or <br />interrupted during construction activities. Lateral improvements <br />would be designed to provide water-carrying capacity historically <br />available or to carry optimum irrigation flows based upon the <br />irrigated acreage, whichever is greater. This would in turn permit <br />the irrigation company and districts to divert the same amount of <br />water after improvements have been made as was diverted in the past. <br /> <br />12. WILL I BE ASKED TO RELINQUISH MY WATER RIGHTS? <br /> <br />No, the status of water rights will not change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.