My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08183
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:27 PM
Creation date
10/12/2006 2:47:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.400
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Land Management
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Author
BLM
Title
BLM Planning - A Guide to Resource Management Planning on the Public Lands
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />'] <br /> <br />I <br /> <br />.", <br />i <br /> <br />',': ,.~<;i~>.~.:: <br /> <br />responsibly for the future of the public's resources, Preparing a <br />Resource Management Pian takes about 20 to 24 months from start <br />to finish. <br /> <br />";., <br /> <br />Planning activities are guided by a number of Federal laws pass- <br />ed by Congress. The Federal Land Policy and Management Act <br />of 1976 requires that BLM prepare and use plans under principles <br />of multiple-use and sustained yield. It also requires public participa- <br />tion and close coordination with other Federal agencies, State and <br />local governments, and Indian tribes. Other laws specifically deal- <br />ing with planning or environmental study requirements include the <br />Federal Coal Leasing Amendments Act of 1976, the Surface Min- <br />ing Control and Reclamation Act 'of 1977, arid t1ieNati6naIEn- <br />vironmental Policy Act of 1969. Many other laws relating to specific <br />resource uses also have an ~lmpact on the planning process. <br /> <br />Assumes overall responsibility lor the <br />Bureau Planning System, Issues na- <br />tional guidance, Develops pro- <br />cedures and sets budget priorities. <br /> <br />.' <br />""7,..'~:' : <br />,;. <br /> <br />AREA <br />MANAGER <br /> <br />Prepares, implements, and monitors <br />the Resource Management Plan. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.