My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08165
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:23 PM
Creation date
10/12/2006 2:47:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
7/24/1992
Author
USGS
Title
The Barr Lake Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />"",r,I,"n <br /> <br />TABLE ES-l <br /> <br />SUMMARY OF PREFERRED ALTERNATIVE COSTS <br /> <br /> . Capital Annual <br />Alternative Description Cost o &: M Cost <br /> . ($ Million) . ($ Thous/Yr) <br />Al · Stream modifications above & below 88th Ave, 32 630 <br /> · Effluent diversion to 3 ditches via carrier ditches <br />A2 · Stream modifications above & below 88th Ave. 44 480 <br /> · Effluent diversion to 3 ditches via p.ipeline <br />B · Stream modifications above & below 88th Ave. 32 670 <br /> . Artificial reaeration at 168th Ave. <br />CI · Stream modifications above & below 88th Ave, 52 970 <br /> · Artificial reaeration at l68th Ave. <br /> · Effluent diversion to 2 ditches via carrier ditches <br />C2 · Stream modifications above & below 88th Ave. 59 840 <br /> · Artificial reaeration at 168th Ave. <br /> . Effluent diversion to 2 ditches via pipeline <br />0 · Stream & drop strUcture modifications at 88th Ave. 56 880 <br /> · Artificial reaeration below 88th Ave, <br /> · Artificial reaeration at 168th Ave. <br />E · Filter all Central Plant effluent 102 3,950 <br /> · Chlorination/dechlorinalion <br />H · Stream modifications above & below 88th Ave. 114 4,640 <br /> · Nitrify S, Complex to below 5 mg/I (NH)-N) <br /> · Chlorination/dechlorination <br /> <br />Alternatives AI, A2, CI, and C2. Selection of artificial reaeration site(s) will be critical to <br />successfully implementing Alternatives B, CI, C2, and D. Although filtration of Central Plant <br />effluent (Alternative E) may be attractive from a water reuse perspective, existing sediments may <br />continue to cause stream DO depletion for some time. The District may want to evaluate the <br />costlbenefit of filtration, coupled with limited sediment dredging and stream channel modifications, in <br />terms of overall benetits to the metropolitan Denver water supply, as well as the alleviation of DO <br />problems .in Segment IS. <br /> <br />D-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.