Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~Y?c):l <br /> <br />Henrylyn System <br /> <br />I. Denver-Hudson Canal. An extension of the Burlington.O'Brian Canal, 300 cfs for <br />direct flow, priority date 11/2811907. <br /> <br />2. Prospect Reservoir. 5,970 acre feet, 11121/1910 priority and 1,690 acre feet, <br />7/20/1922 priority. <br /> <br />3. Olds reservoir. 534 acrefeet, priority 1/28/1918 and 548 acre feet, priority <br />6/15/1922. <br /> <br />4. Horse Creek Reservoir. 16,985 acre feet, 3/17/1911 priority and 2,550 acre feet, <br />7/20/1922 priority. <br /> <br />5. Lord Reservoir. <br /> <br />All of the systems divert from the main stem of the South Platte River at a location <br />immediately upstream from the discharge of the Denver Metro Wastewater Reclamation <br />facility. Metro wastewater can be pumped into the Burlington-O'Brian Canal at a rate of 180 <br />cfs through three installed pumps. There are two additional pump bays at the station which <br />could increase the pumping capacity to the Burlington-O'Brian. The discharge to the <br />Burlington-O'Brian is a regulated effluent discharge location. <br /> <br />A-3 <br />