Laserfiche WebLink
<br />,:~1 <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase II (Total Project) <br />(continued) <br /> <br />Pipelines, Canals, and Laterals <br /> <br />Ridges Basin Inlet Conduit <br />Durango M&I Pipeline <br />Shenandoah M&I Pipeline <br />La Plata Rural M&I Pipeline <br />Dry Side Canal (majority earth-lined, 0.9 mile <br />concrete-lined section) <br />Long Hollow Tunnel (10.5-feet-dia, concrete lined) <br />Southern Ute Inlet Canal (concrete-lined) <br />Southern Ute Interim Irrigation Canal (earth-lined) <br />New Mexico Irrigation Canal (earth-lined) <br />Laterals <br /> <br />, <br />, <br /> <br />Recreation Areas <br /> <br />Length <br />(miles) <br /> <br />Capacity <br />( cf&) <br /> <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Would not be constructed <br />27.57 700 to 230 <br /> <br />Constructed in Phase I, Stage B <br />3.3' 375 <br />Abandoned in Phase II <br />3.1 140 <br />190,79 Various <br /> <br />Ridges Basin Recreation Area -- Would be constructed in Phase I, Stage A. <br /> <br />Southern Ute Reservoir Recreation Area <br />People at one time 950 <br />Annual recreation days 181,000 <br />Facilities: Hiking trails, camping units, picnic units, boat ramp and slips, parking area, <br />entrance station, beach, fish cleaning station, administrative building. <br /> <br />7 The last 1.9 miles of Dry Side Canal would be constructed in Phase II. <br /> <br />, The last 0.7 mile of Southern Ute Inlet Canal would be constructed in Phase II. <br /> <br />9 Approximately 81.1 miles of irrigation laterals would be constructed in Phase II. <br /> <br />4 <br />