Laserfiche WebLink
<br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase I, Stage A <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam <br />Height above streambed (feet) <br />Crest Length ( feet) <br /> <br />313 <br />1,900 <br /> <br />Ridges Basin Reservoir <br />Capacity <br />Active Capacity ( acre- feet) <br />Inactive and Dead Capacity (acre-feet) <br />Total Capacity (acre-feet) <br /> <br />127,900 <br />145200 <br />273,100 <br /> <br />Surface Area (at top of active - elev. 6,964 feet) (in acres) <br /> <br />2,240 <br /> <br />Pumping Plants <br /> <br />Maximum <br />lift (feeO <br /> <br />Capacity <br />(cfs) <br /> <br />Durango Pumping Plant <br />Ridges Basin Pumping Plant <br /> <br />525 <br />930 <br /> <br />70 <br />10 <br /> <br /> Length Diameter Capacity <br />Pipelines (miles) (inches) (cf&) <br />Ridges Basin Inlet Conduit 2.4 120 480 <br />Durango M&I Pipeline 3.2 18 11 <br />Shenandoah M&I Pipeline 7.8 18 to 6 5.6 to 0.28 <br />La Plata Rural M&I Pipeline' 4.7 14 4 '-~, <br />Recreation Facilities <br /> <br />Ridges Basin Reservoir Recreation Area <br />People at one time 3,000 <br />Annual recreation days 290,000 <br />Facilities: Hiking trails, camping units, picnic units, boat ramp and slips, parking area, <br />entrance station, beach, fish cleaning station, administrative building. <br /> <br />I Would be constructed if only Phase !, Stage A were constructed, <br /> <br />1 <br />