My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08124
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:16 PM
Creation date
10/12/2006 2:46:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
10/1/1996
Title
Animas-La Plata Project Summary Information
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase I, Stage A <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam <br />Height above streambed (feet) <br />Crest Length ( feet) <br /> <br />313 <br />1,900 <br /> <br />Ridges Basin Reservoir <br />Capacity <br />Active Capacity ( acre- feet) <br />Inactive and Dead Capacity (acre-feet) <br />Total Capacity (acre-feet) <br /> <br />127,900 <br />145200 <br />273,100 <br /> <br />Surface Area (at top of active - elev. 6,964 feet) (in acres) <br /> <br />2,240 <br /> <br />Pumping Plants <br /> <br />Maximum <br />lift (feeO <br /> <br />Capacity <br />(cfs) <br /> <br />Durango Pumping Plant <br />Ridges Basin Pumping Plant <br /> <br />525 <br />930 <br /> <br />70 <br />10 <br /> <br /> Length Diameter Capacity <br />Pipelines (miles) (inches) (cf&) <br />Ridges Basin Inlet Conduit 2.4 120 480 <br />Durango M&I Pipeline 3.2 18 11 <br />Shenandoah M&I Pipeline 7.8 18 to 6 5.6 to 0.28 <br />La Plata Rural M&I Pipeline' 4.7 14 4 '-~, <br />Recreation Facilities <br /> <br />Ridges Basin Reservoir Recreation Area <br />People at one time 3,000 <br />Annual recreation days 290,000 <br />Facilities: Hiking trails, camping units, picnic units, boat ramp and slips, parking area, <br />entrance station, beach, fish cleaning station, administrative building. <br /> <br />I Would be constructed if only Phase !, Stage A were constructed, <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.