<br />Phase II - Water Supply, Facilities, and Operation (proposed Plan) <br /> <br />" <br /> <br />I <br /> <br />Phase II - Water Supply <br /> <br />Following future ESA consultation with the Service, an additional water supply could be <br />developed for Project uses of up to a total of 191,230 acre-feet annually (using the total <br />depletion of up to 149,220 acre-feet) (table 2). The total water supply is reduced from that <br />shown in the 1980 FES Plan because of the elimination of Project lands in the La Plata River <br />drainage. <br /> <br />Phase II - Facilities <br /> <br />Additional Project facilities that would be constructed and operated for Phase II are listed in <br />table 1. Those facilities would complete Phase II, as defined in the 1986 Cost Sharing <br />Agreement. Phase II facilities that would be constructed include Southern Ute Dam and <br />Reservoir; La Plata Diversion Dam; the remaining portion of Dry Side Canal, which would be <br />extended to near the Ute Mountain Ute Reservation boundary; New Mexico Irrigation Canal; <br />Alkali Gulch, Ute Mountain, Southern Ute, and Third Terrace Pumping Plants; and the <br />laterals to serve the Phase II lands. <br /> <br />In addition, the remaining portion of Southern Ute Inlet Canal would be constructed to deliver <br />water to Southern Ute Reservoir. With this and the construction of the New Mexico <br />Irrigation Canal, the Southern Ute Interim Irrigation Canal would no longer be needed and <br />would be abandoned. Additional pumps would be installed in Ridges Basin Pumping Plant to <br />meet Phase II water supply needs. The Phase II capacity of the plant would be 700 cfs. <br /> <br />Phase II - Operation <br /> <br />With the completion of Phase II, all lands would be able to receive irrigation water. All <br />Project lands would receive a pressurized supply of water sufficient to operate sprink1er <br />systems with the exception of Project lands above Dry Side Canal, which would be supplied <br />Project water by exchange. Delivery ofM&I water for the Southern Ute Indian Tribe could <br />be at Ridges Basin Reservoir or Southern Ute Reservoir, Under Phase II, delivery of Ute <br />Mountain Ute M&I water would be at the end of Dry Side Canal, near the eastern border of <br />the Ute Mountain Ute Reservation. Delivery of all non-Indian M&I water would be the same <br />as in Phase I, Stage B. <br /> <br />Historical flows in the La Plata River downstream from Dry Side Canal would be moderately <br />increased as a result of water released into the river from Dry Side Canal and Project return <br />flows. An average of 15,100 acre-feet would be released into the La Plata River from Dry <br />Side Canal each year to meet downstream Project demands and minimum bypass flows at the <br />Southern Ute Diversion Dam. <br /> <br />.~ <br /> <br />;~~ <br />.;J <br /> <br />28 <br />