My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08097
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:09 PM
Creation date
10/12/2006 2:46:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8507
Description
Rio Grande Project
State
CO
Basin
Rio Grande
Date
2/1/1961
Title
Final Report Hydralic Model Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I :; <br />! ~;..1 <br />, g; <br />".J <br /> <br />CONCLUSIONS <br /> <br />{j <br /> <br />structure <br /> <br />'..-., <br /> <br />The results of the model studies showed that Weir G (the cross <br /> <br />section of which is shown in Fig. 8) would be suitable for use in the <br /> <br />Rio Grande as a control and measuring structure. Modification of the <br /> <br />sloping faces of the weir flatter than 2:1 and 3:1 for the upstream and <br /> <br />;~:;; <br /> <br />downstream slopes, respectively, did not improve the hydraulic per- <br /> <br />tr:; <br /> <br />formance of the structure. The crest of the structure should be wide <br /> <br />~.~~ <br /> <br />enough, parallel to the flow, for the establishment of a good measur- <br /> <br />ing section. For unit discharges up to 25 cfs per ft, 10 ft would be <br /> <br />sufficient, but wider structures may be used. Measurements of discharges <br /> <br />':;' <br /> <br />and stages should be made within the middle third of the structure. The <br /> <br />recommended height of sill is one foot above the crest of the weir. (See <br /> <br />Fig. 8.) This height will allow control to be maintained at the sill and <br /> <br />create sufficient velocities over the crest of the structure at low dis- <br /> <br />Charges for measurement With a current meter. The elevation of the top <br /> <br />, <br /> <br />of the sill with respect to tailwater level must be estabJ.ished with <br /> <br />adequate field information on stage discharge relations at the site. Use <br /> <br />of Fig. J.9 will assist in the establishment of the sill level. <br /> <br />stage-Diecharge Relation <br /> <br />The stage-discharge rating at the structure is unaffected by upstremm <br /> <br />channel aggradation so long as the bed does not Bggrade above the crest of <br /> <br />the structure. It is affected, however, at any unit discharge by changes <br /> <br />in tailwater level if the submergence is greater than about 60 percent. <br /> <br />-33- <br /> <br />'l-'l :I~, "~ <br />I-....*,,-.. ~""' <br />
The URL can be used to link to this page
Your browser does not support the video tag.