My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08089
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:08 PM
Creation date
10/12/2006 2:45:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
6/1/1955
Title
Arkansas-White-Red River Basins - Part II - Section 5 - Drainage
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0 <br />'.., <br />~ <br />-.J <br />CJ:I <br />~ Table No. <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> <br />llate2l2.:. <br /> <br />1 <br />2 <br />3 <br />4 <br /> <br />5 <br />6 <br /> <br />;I <br />I <br />!I <br />.J <br />1 <br />~~ <br />f, <br />II <br />i <br /> <br />7 <br /> <br />TABLE OF CONTENTS (CONT'D) <br /> <br />Tables <br /> <br />Wetland Areas, Arkansas River Basin <br />Wetland Areas; White River Basin <br />Wetland Areas, .Red River Basin <br />Costs and Benefits, Proposed Plans of Im- <br />provement, Arkansas River Basin <br />Associated Annual Costs, Arkansas River <br />Basin <br />Tentative Division of Construction and Annual <br />Cost, Arkansas River Basin <br />Costs and Benefits, Proposed Plans of Im- <br />provement, White River Basin <br />Associated Annual Costs, White River Basin <br />Tentative Division of Construction and Annual <br />Cost, vlliite River Basin <br />Costs and Benefits, Proposed Plans of <br />Improvement, Red River Basin <br />Associated Annual Costs, Red River Basin <br />Tentative Division of Construction and <br />Annual Cost, Red River Basin <br />Costs and Benefits, Proposed Plans of Im- <br />provement, Arkansas, White and Red River <br />Basins <br />Land Use, With and Without Drainage, <br />Arkansas, White and Red River Basins <br />Effects on Agricultural Production by <br />States and Basins <br /> <br />Plates <br /> <br />Title <br /> <br />Wetland Problem Areas <br />Typical Layout, Individual Farm Drainage System <br />Typical Farm Drainage System for Irrigated Land <br />Typical Layout, Individual Rice Farm Irrigation <br />and Drainage System <br /> <br />Proposed Federal Projects <br /> <br />Florence Drainage Project, Colorado <br />Arkansas Valley Drainage and Flood Control <br />Project, Colorado <br />Conway County Drainage and Levee District <br />No. 10, Arkansas <br /> <br />ix <br /> <br />Page No. <br /> <br />22-24 <br />32 <br />36-37 <br />58 <br /> <br />60 <br /> <br />63 <br /> <br />71 <br /> <br />73 <br />76 <br />86 <br /> <br />88 <br />91 <br />94 <br /> <br />96 <br />98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.