Laserfiche WebLink
<br />Table <br /> <br />II-I <br />11-2 <br /> <br />11-3 <br /> <br />IV-I <br />IV-2 <br />IV-3 <br /> <br />IV-4 <br />IV-5 <br /> <br />IV-6 <br /> <br />IV-7 <br /> <br />IV-8 <br />IV-9 <br /> <br />IV-I0 <br />IV-11 <br /> <br />IV-12 <br /> <br />IV-13 <br /> <br />IV-14 <br /> <br />V-I <br /> <br />V-2 <br /> <br />V-3 <br /> <br />V-4 <br /> <br />V-5 <br /> <br />vi <br /> <br />CONTENTS (continued) <br /> <br />TABLES <br /> <br />Numeric criteria for lower Colorado River. . . . . . . . . . . . <br />Flow-weighted annual average salinity <br />at Imperial Dam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Canal lengths and estimated present-day <br />seepage volumes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Subunit salt load reduction - RP plan ............... <br />Off-farm O&M summary - RP plan . . . . . . . . . . . . . . . . . <br />Estimated impacts and proposed mitigation measures <br />for Reclamation's off-farm activities .............. . . <br />Irrigated acres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Employment (1989)-major business sectors <br />production-oriented sectors. . . . . . . . . . . . . . . . . . . . . . . <br />National economic development account for <br />NEDandRPplans ............................ <br />RED account winter water plan and off-farm <br />irrigation improvement . . . . . . . . . . . . . . . . . . . . . . . . . <br />Environmental impacts . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Factor weights by local water users and salinity <br /> <br />interests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Factor and plan performance (concerned publics) ...... <br />Summary comparison of viable plans and the <br />no action alternative ........................... <br />Cost effectiveness of combined salinity reduction <br /> <br />(RP plan) .................................... <br />Domestic service and lined stockwater ponds <br />capital cost per each connection or pond . . . . . . . . . . . . . <br />Reimbursable and nonreimbursable amounts for <br />salt reduction components (1989 dollar value) ........ <br />Effects of the preferred plan on resources of <br />principal national recognition, Price-San Rafael <br />River basins, Utah . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Preferred plan - compliance with Water Resource <br />Council - designated environmental statutes, <br />Price-San Rafael River basins, Utah .... . . . . . . . . . . . <br />Estimated wetland vegetation losses from canal <br />and lateral abandonment on the Price-San Rafael <br /> <br />Rivers Unit .................................. <br />Projected onfarm vegetation coverage (acres) from <br />no action conditions to full implementation of <br />onfarm measures of the RP and NED plans ......... <br />Projected changes in irrigation coverage <br />(acres) from no action conditions to <br />full implementation of onfarm measures <br />of the RP plan ................................ <br /> <br />Page <br /> <br />11-3 <br /> <br />11-3 <br /> <br /> <br />11-6 <br />IV-7 <br />IV-15 <br /> <br />IV-17 <br />IV-25 <br /> <br />IV-30 <br /> <br />IV-35 <br /> <br />IV-37 <br />IV-38 <br /> <br />IV-42 <br />IV-43 <br /> <br />IV-45 <br /> <br />IV-47 <br /> <br />IV-48 <br /> <br />IV-51 <br /> <br />V-2 <br /> <br />V-3 <br /> <br />V-9 <br /> <br />V-11 <br /> <br />V-12 <br /> <br />(Ju(4Ll0 <br />