Laserfiche WebLink
<br />~ <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />Department of Energy <br />Finding of No Significant Impact <br /> <br />Proposed Power Rate Adjustment <br />Colorado River Storage Project <br /> <br />The Western Area Power Administration, Department of Energy (DOE), has prepared <br />an environmental assessment (EA) on the proposed power rate adjustment on the <br />Colorado River Storage Project (CRSP). Based on the findings ot the EA, DOE <br />has determined that the proposed action does not constitute a major Federal <br />action significantly affecting the quality of the human environment within <br />the meaning of the National Environmental Policy Act of 1969, 42 U.S.C. 4321. <br />~~. Therefore, no environmental impact statement is required. The <br />proposed rate adjustment will increase the rates charged for electricity <br />generated by facilities of the CRSP. Public Law (P.L.) 84-485, CRSP, authorizes <br />the comprehensive development of the water resources of the upper Colorado <br />River Basin for the purposes including regulating the flow of the river, <br />water storage, flood control, and generation of hydroelectric power. <br /> <br />Repayment studies were made by Western in February 1980 to determine the power <br />revenues needed to accomplish timely repayment of the investment costs assigned <br />to the power function. The studies indicated that a rate increase of 25.8 <br />percent will be needed. A comparison of the existing rates under Rate Schedules <br />UC-F2 and UC-FP2 effective June I, 1977, and the proposed rates and Rate <br />Schedules SP-F1 and SP-FP1 is as follows: <br /> <br />Firm Capacity and Energy Existing Proposed <br />Demand charge $1.34 per kW month $1.76 per kW month <br />Energy charge $0.0034 per kWh $0.0041 per kWh <br />Composite rate @58.2% <br />load factor $0.00655 per kWh $0.00824 per kWh <br />Peaking capacity $1.76 per kW month <br />~~~~~ $1.34 per kW month <br /> <br />At 58.2 percent load factor, the proposed rate is 8.24 mills per kWh, an <br />increase of 1.69 mills per kWh or 25.8 percent over the existing rate. For <br />contract violations involving unauthorized overruns, the rate will be 10 times <br />the above rates. <br /> <br />Comparison of the proposed increased rate for CRSP power with wholesale rates <br />presently offered by utilities in the CRSP market area )ndicates that the <br />rates currently offered by the utilities are considerably higher than the <br />proposed CRSP rate. <br /> <br />At 58.2 percent load factor, the rates offered by utilities range from about <br />18 to 24 mills per kWh, or about 118 to 191 percent higher than the proposed <br />CRSP rate. Thus, the rate change provides no economic inducement for the <br />CRSP customers to seek alternative power resources. <br />