Laserfiche WebLink
<br />Land modification is not anticipated from off-farm delivery system <br />improvements so that cultural resources will not be disturbed. If <br />detailed designs require land modification then site specific investi- <br />gation of cultural resources would be needed, Site specific investiga- <br />tions may also be needed after detailed designs are prepared for onfarm <br />ditch lining or pipelines, <br /> <br />Comparative Analysis for Plans <br /> <br />Irrigation efficiencies for the alternatives are listed in Table 8. <br />Water and salt budgets are given in Table 9, Comparative analyses of <br />economic development, environmental quality and ~ther social effects <br />for future without and alternative 2 plans are shown in Tables la, 11 <br />and 12. The Recommended Plan and Implementation Program section provides <br />further information on Alternative 2 which is the recommended plan. <br /> <br />.) <br /> <br />46 <br /> <br />1,\, "ll" r <br />l. '" ,. <br /> <br />" <br />o <br />