My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08072
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:02 PM
Creation date
10/12/2006 2:45:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 7
State
CO
Basin
Statewide
Date
10/18/1967
Author
Patrick A Hurley
Title
Augmenting Upper Colorado River Basin Water Supply By Weather Modification
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n )'1l43'l <br /> <br />ffj <br /> <br />benefit-cost ratios; the flexibility of use, largely with epdsting water <br />and power systems; and the opportunity for obtaining even greater <br />new water yields with advanced techniques point to weather modifica- <br />tion as a very desirable tool for water resources management. Invest- <br />ment of considerable sums for research could be nearly justified by a <br />single yearly benefit, <br /> <br />) <br /> <br />, <br />. <br /> <br />The Upper Colorado River Basin will be one of the first regions where <br /> <br /> <br />a reliable, optimized, capability to increase precipitation will be <br /> <br /> <br />developed on a regionwide basis. Much of the experience gained here <br /> <br /> <br />will greatly aid in making weather modification a working partner in <br /> <br /> <br />easing water problems for other areas. Because of its importance, <br /> <br /> <br />every care should be taken to make development efforts in this Basin <br /> <br /> <br />successful. There is every reason to believe that firm, acceptable, <br /> <br /> <br />answers and workable systems can be successfully achieved within <br /> <br /> <br />10 years, given the required effort and vision, <br /> <br />~x~~t. <br />I <br />~~"~:i <br /> <br />I <br /> <br />~.. <br /> <br />IJ <br />~{WZ <br />~4'f,;; <br />~<<"l{t.,.s <br />"dM <br />G~l~m <br />if~ <br /> <br />~.,.:t. <br />~~1~ <br />t!F.<<." <br />~i3~ <br />r~"'Y.."" <br />~i' <br />"'.",'~ <br /> <br />"" <br /> <br />,~ <br /> <br />36 <br /> <br />~:z~ <br />~j~t~~ <br />;->~,: ','C <br />:::.~." ~ ",,-: <br /> <br />p.'. <br /> <br /> <br />,,:;,~i~J~tli~~i'ki~~iill~!;i~liF~~Iiit~r~!i~I~;~\'~~lifLII~i.~I{~rlll!(f.~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.