Laserfiche WebLink
<br />Planning and Design <br />Installation Cost <br /> <br />$ 120,000 I-year period <br />300, 000 I-year period <br />350,000 per year <br /> <br />I <br />I <br />;.t~)~;l <br />I <br />I <br />;~~~%~ <br />ri#"'t:;~ <br />'1-:~'.-;?;- <br />~~~-' <br />~~ <br />,~~q <br />~~~~ <br />?&~~~ <br />~."l!I. <br />~~~~ <br /> <br />ilfH) 9 3 1 <br /> <br />The following cost estimates for typical experimental a;nd pilot <br />projects were developed in preparing "Plan to Develop Technology <br />for Increasing Water Yield from Atmospheric Sources," <br /> <br />Experimental Projects <br /> <br />Continuing Operation <br /> <br />Pilot Projects <br /> <br /> <br />Detailed Planning and Design $ 600, 000 I-year period <br /> <br /> <br />Installation Cost 2,000,000 I-year period <br /> <br />Continuing Operation I, 660, 000 per year <br /> <br />Included in the above costs are the environmental and engineering <br />support studies to relate weather modification with the natural and <br />social regimes of the Basin. While no serious detrimental effects <br />are expected, careful monitoring of fish and wildlife as well as other <br />ecological groups will receive emphasis during the research activities <br />with continuing study into the operational program. Costs for prelim- <br />inary environmental studies are estimated at $16,000 and $85,000 <br />during planning of experimental and pilot projects. Up to $80,000 per <br />year is included in continuing experimental operations and $200, 000 <br /> <br />5t,-~." <br /> <br /> <br />I <br /> <br /> <br />-, <br /> <br />'b <br /> <br />investigations. <br /> <br />..'. '.'.- ~, <br />"":~.. ~.,~ ", <br />.-'::.",". <br />~tf.~~;~~~~~: <br />:'~~~.~:-:f; <br /> <br />per year in the pilot project continuing costs for environmental <br /> <br />,~_;.~:_._._c. <br />',.,..'.....- <br />-'. .~.. .-. <br /> <br />-....... <br />..-.....? <br />'-:...~~-,:~ -.. <br />:~~:V.::;:; <br />~".j,\~;-~:- .:~ <br /> <br />34 <br />