My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08072
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:02 PM
Creation date
10/12/2006 2:45:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 7
State
CO
Basin
Statewide
Date
10/18/1967
Author
Patrick A Hurley
Title
Augmenting Upper Colorado River Basin Water Supply By Weather Modification
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000924 <br /> <br />center with real-time data analysis and display,. and a communications <br />system. Maintaining, updatillg, and expanding ~hese items for a regu- <br />lar operational program might cost an additional $200,000 annually, <br /> <br />Annual operating costs, mostly teclmical and scientific salaries, and <br /> <br />overhead expenses should be about $350,000, Included in the operating <br />costs would be a continuing analysis of the cloud seeding and the results <br />produced. Monitoring and continuing evaluation of the possible effects <br />on ecological regimes might cost an additional $50,000 per year, <br /> <br />The total estimated annual cost of a full-scale winter cloud seeding <br />operation in the high elevation target areas is $2, 650, 000, <br /> <br />Annual generator system <br /> <br />$ 400,000 <br />1,400,000 <br />300,000 <br />200,000 <br />350,000 <br />500.00. <br />,I. -, <br /> <br />Seeding materials <br /> <br />Generator servicing <br />Other facilities maintenance <br /> <br />Operating costs <br />Ecological monitoring <br />Total annual cost <br /> <br />$2,650,000 <br /> <br />" <br /> <br />.' <br /> <br />The unit cost of producing 1, 870, 000 acre-feet of new water by cloud <br />seeding is thus about $1. 50 per acre-foot, Estimated costs shown <br />above are probably on the high side, representing perhaps the upper <br />limit for operational costs, Careful project design, once more is <br />known could reduce unit costs to as low as $1. 00 per acre-foot. <br /> <br />27 <br /> <br />:i~::~~';~.}0};r~~~"'~:;I;'~ <br />tj,~;f.;":'.:'f:.''!r-:/.~:<<f/ii <br />~~li~~t!{~~~~~-, <br /> <br />1,~~i~~~t~~~~'::}~~;'~6i:~1?-~~:t~j$%I~'~~if:~~~~1;~~~~;!.~~:1:~;;t;?i~~?;~~;;"~'~~~:'~r:r&;~\,?"~~ <br /> <br />"".R-::'"~jf.'"~~~.., ~J;::";f,';'-<i" ::.%;.:;:.,;-:;,~ ~.." .~~~ "~'... ~~:?f.~j:~ -. .~. . ;:;0; :'Y.'''''';.... "k--"; !"<";:"'~-':.:~f::..r".... ~itt~(~(.''(.~ <br /><' ~ '.,~::;~~:~'." ~,,-K- ~~,_.\~ :~;)~...::i;i~%)~:-ji:':-:;h~~5.;.,:~~'~~~J:l~.: ,.l\~{~J't~ttf(..-:::~~~~f!~~1/~' {;Jf.;(h>:t\- <br /> <br /> <br />~~1 <br /> <br />I <br />- <br />1f.~~ <br />r~~:::N~ <br />~:~fti~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />fr'-:''''k~ <br />~~tr~ <br />rt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.