Laserfiche WebLink
<br />~ <br /> <br />~ <br />~ <br />- <br />N <br /> <br />o <br /> <br />- 2 - <br /> <br />per cent for machinery and .3 per cent for transmission capital; <br />operation and maintenance of power plant and transmission line of <br />$510,000 per year; and steam standby costs caloulated in the same <br />manner as set forth in paragraph 5. <br /> <br />7. The following examples show the <br />of steam power at Midvale, Utah, and the cost <br />delivered at Los Angeles, under two different <br /> <br />comparison of the cost <br />of Boulder Dam power <br />monthly load factors. <br /> <br />Condition <br />"X" <br /> <br />Condition <br />"y" <br /> <br />Kilowatts monthly peak <br />Kilowatt-hours per month <br />Load Factor <br /> <br />8,500 <br />2,100,000 <br />34 <br /> <br />7,500 <br />4,850,000 <br />88 <br /> <br /> Boulder steam Boulder steam <br /> Power at Power at Power at Power at <br /> Los Angeles Midvale, Los Angeles Midvale, <br /> Calif. Utah Calif. Utah <br />Monthly demand charge $ 8,410 $ 6,200 $ 7,430 $ 5,470 <br />Monthly energy charge $ 2,270 $ 2,290 5,240 $ 5,280 <br />Total monthly charge 10,680 8,490 $ 12,670 10,750 <br />Mills per Kw-hr. 5.10 4.04 2.62 2.22 <br /> <br />5-13-38. <br />