My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08031
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:52 PM
Creation date
10/12/2006 2:43:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title 1 - Yuma Desalter
Basin
Colorado Mainstem
Date
4/1/1977
Author
USDOI/BOR
Title
Colorado River Basin Salinity Control Project - Title I Division - Desalting Complex Unit, Arizona - Status Report
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />15. Colorado River International Salinitv Control Proiect. Special <br />Report; United States Department of the Interior, Bureau of <br />Reclamation and Office of Saline Water, September 1973. <br /> <br />16. RO-Cost: A Fortran Code for the Calculation, of Hvdrodvanamic Data <br />and Parametric Capital and Water Costs for Hollow Fine Fiber, Spiral <br />Wound, and Turbular Reverse Osmosis Plant; Fluor Engineers and <br />Constructors, Inc., for Office of Saline Water; October 1973. <br /> <br />17. Water Desalting; A. A. Delyannis and E. A. Delyannis; 1974. <br /> <br />*18. Public Law 93-320; Colorado River Basin Salinity Control Act; June 24, <br />1974. <br /> <br />19. Measures for Reducing Return Flows from the Well ton-Mohawk Irrigation <br />and Drainage District, Special Report; the Advlsory Commlttee on <br />Irrigation Efficiency, Wellton-Mohawk Irrigation and Drainage <br />District. September 1974. <br /> <br />. <br /> <br />2D. Yuma Desalting Plant, Preliminary Engineering Analysis, Colorado <br />River Basin Salinity ControlPtbject; Burns and Roe, Inc., for Office <br />of Water Research and Technology, November 1974. <br /> <br />21. An Arizona Trade-Off Model Analysis of a Proposed Desalting Complex <br />in Yuma County, Arizona; State of Arizona, Office of Economic <br />Planning and Development, November 1974. <br /> <br />22. Parametric Cost Studies for Proposed Desalting Plant, Colorado River <br />Internatlonal Sallnlty Control ProJect; rluor tnglneers and <br />Constructors, Inc., tor ~ureau ot Keclamation, December 1974. <br /> <br />23. Desaltinq Plants Inventorv Report No.5; Office of Water Research <br />and Technology, 1975. <br /> <br />24. Duality of Water, Colorado River Basin, Progress Report No.7; <br />United States Department of the Interlor, January 1975. <br /> <br />*25. Minute No. 248; International Boundary and Water Commission, United <br />States and Mexico; June 10, 1975. <br /> <br />26. Final Environmental Statement, Colorado River Basin Salinity Control <br />Project, Title I; INT FES 75-57, United States Department of the <br />Interior, Bureau of Reclamation, Lower Colorado Region, in support <br />of Public Law 93-320, filed with the Council on Environmental Quality <br />June 18, 1975. <br /> <br />27. Code of Federal Reoulations, Volume 41, revised July 1, 1975. <br /> <br />. <br /> <br />28. Preliminary Sizing Study, Yuma Desalting Plant, Arizona, Special <br />Report; United States Department of the Interior, Bureau of <br />Reclamation, Lower Colorado Region, July 1975. <br /> <br />xvi <br />
The URL can be used to link to this page
Your browser does not support the video tag.