Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Golorado Ri.ver Basin Sa-l i.nity .Gontrol-Project <br />Title I Division <br />Desalting Complex Unit <br /> <br />STATUS REPORT <br />Apri 1 1977 <br />(Covering Activities Through June 1976) <br /> <br />FOR EloJOR D <br /> <br />Authorization to construct, operate, and maintain the Desalting Complex <br />Unit was approved June 24, 1974,in Section 101 of Public Law 93-320, the <br />Colorado River Basin Salinity Control Act. The September 1973 Special <br />Report, Colomdo River International Salinity Control p"oject, prepared <br />jointly by the Bureau of Reclamation and Office of Saline Water, is the <br />basis for the project authorization. <br /> <br />This Status Report presents the findings of advance planning studies and <br />project activities through June 1976. Some project construction activities <br />were underway at that time, while other project activities, such as the <br />design of the Yuma Oesalting Plant, will undergo future modification prior <br />to implementation. Because of the need for a document describing signifi- <br />cant project activities since authorization, while simultaneously recognizing <br />that some project features will not be finalized in plan until 1978 or 1979, <br />available information is presented in this Status Report. <br /> <br />The most significant reason for preparation of this report is the need to <br />describe a conceptional design of the Yuma Desalting Plant. This design, <br />completed in December 1975, was prepared for the purpose of scoping per- <br />formance, structures, and equipment requirements as a basis for requesting <br />and evaluating proposals for furnishing membrane desalting equipment. <br /> <br />_. I.h~J~~uJ!~-.9i advance p]anni_n~t~~i~.!:~sented_ in this Status Report <br />are refinements and modifications of concepts of authorized project <br />measures. Changes in general consist of refined hydrologic studies for <br />desalting plant sizing; inclusion of desalting plant pretreatment and <br />equipment performance characteristics as determined from information <br />provided by manufacturers, and by testing with actual plant feed water; <br />identification of specific fish and wildlife mitigation measures; and <br />updating costs. The refinements and modifications do not add features <br />to or delete features from the authorized plan, or change the objective <br />results of the plan. <br /> <br />This report does not include conclusions of studies on reject stream replace- <br />ment alternatives. These studies are ongoing and are scheduled to be com- <br />pleted in fiscal year 1980. This report also does not include the findings <br />of advance planning studies on the Coachella Canal Unit and the Protective <br />and Regulatory Pumping Unit, authorized by Sections 102 and 103, respectively, <br />of Public Law 93-320. Definite Plan Reports will be prepared later for each <br />of these un its. <br />