My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08031
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:52 PM
Creation date
10/12/2006 2:43:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title 1 - Yuma Desalter
Basin
Colorado Mainstem
Date
4/1/1977
Author
USDOI/BOR
Title
Colorado River Basin Salinity Control Project - Title I Division - Desalting Complex Unit, Arizona - Status Report
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />Page <br /> <br />CHAPTER XI.lNVESTMENT COSTS <br /> <br />18] <br /> <br />A. Estimating Procedures <br /> <br />18] <br /> <br />I. Field Costs <br />2. Ind irect Costs <br />3. Price Levels <br /> <br />18] <br />182 <br />183 <br /> <br />B. Yuma Desalting Plant <br /> <br />183 <br /> <br />I. <br />" <br />". <br /> <br />Construction Cost <br />Operating Equipment Cost <br />Materials for Testing <br /> <br />183 <br />185 <br />185 <br /> <br />3. <br /> <br />C. Bypass Drain <br /> <br />186 <br /> <br />\ . United States <br />1 Me xico <br /> <br />186 <br />186 <br /> <br />D. MODE Siphon. <br />E. Well ton-Mohawk Irrigation Efficiency Improvement Program <br />F. Well ton-Mohawk Acreage Reduction <br />G. Painted Rock Reservoir Land Acquisition and Operation <br />Schcdule Modification <br />H. Fish and Wildlife Mitigation Facilities <br />I. RL'lated Investigations <br /> <br />186 <br />187 <br />188 <br /> <br />188 <br />190 <br />190 <br /> <br />I. <br />" <br /> <br />Yuma Desalting Test Facility <br />Rcject Stream Replacemcnt Studies <br /> <br />190 <br />191 <br /> <br />1. Control Schedule <br />K. Int~n:st During Construction <br />L. Total Federal Investment Cost <br /> <br />191 <br />191 <br />193 <br /> <br />CHAPTER XII. <br /> <br />OPERATION, MAINTENANCE. REPLACEMENT, AND ENERGY <br />COSTS 195 <br /> <br />A. YUllla Desalting Plant <br /> <br />195 <br /> <br />I. Personnel <br />]. Supplies and Materials <br /> <br />195 <br />195 <br /> <br />a. Chemicals <br />b. Materials and Other Supplies <br /> <br />195 <br />197 <br /> <br />viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.