Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />Page <br /> <br />CHAPTER XI.lNVESTMENT COSTS <br /> <br />18] <br /> <br />A. Estimating Procedures <br /> <br />18] <br /> <br />I. Field Costs <br />2. Ind irect Costs <br />3. Price Levels <br /> <br />18] <br />182 <br />183 <br /> <br />B. Yuma Desalting Plant <br /> <br />183 <br /> <br />I. <br />" <br />". <br /> <br />Construction Cost <br />Operating Equipment Cost <br />Materials for Testing <br /> <br />183 <br />185 <br />185 <br /> <br />3. <br /> <br />C. Bypass Drain <br /> <br />186 <br /> <br />\ . United States <br />1 Me xico <br /> <br />186 <br />186 <br /> <br />D. MODE Siphon. <br />E. Well ton-Mohawk Irrigation Efficiency Improvement Program <br />F. Well ton-Mohawk Acreage Reduction <br />G. Painted Rock Reservoir Land Acquisition and Operation <br />Schcdule Modification <br />H. Fish and Wildlife Mitigation Facilities <br />I. RL'lated Investigations <br /> <br />186 <br />187 <br />188 <br /> <br />188 <br />190 <br />190 <br /> <br />I. <br />" <br /> <br />Yuma Desalting Test Facility <br />Rcject Stream Replacemcnt Studies <br /> <br />190 <br />191 <br /> <br />1. Control Schedule <br />K. Int~n:st During Construction <br />L. Total Federal Investment Cost <br /> <br />191 <br />191 <br />193 <br /> <br />CHAPTER XII. <br /> <br />OPERATION, MAINTENANCE. REPLACEMENT, AND ENERGY <br />COSTS 195 <br /> <br />A. YUllla Desalting Plant <br /> <br />195 <br /> <br />I. Personnel <br />]. Supplies and Materials <br /> <br />195 <br />195 <br /> <br />a. Chemicals <br />b. Materials and Other Supplies <br /> <br />195 <br />197 <br /> <br />viii <br />