My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08031
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:52 PM
Creation date
10/12/2006 2:43:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title 1 - Yuma Desalter
Basin
Colorado Mainstem
Date
4/1/1977
Author
USDOI/BOR
Title
Colorado River Basin Salinity Control Project - Title I Division - Desalting Complex Unit, Arizona - Status Report
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. <br /> <br />Construction of the Bypass Drain from the terminus <br />of the existing MODE at Morelos Dam to the Santa <br />Clara Slough in Mexico to carry plant reject; <br /> <br />3. Replacement of a temporary flume section of the <br />MODE in Yuma with a buried concrete siphon; <br /> <br />. <br /> <br />4. Commencement of an Irrigation Efficiency Improvement <br />Program in the Division; <br /> <br />5. Acquisition of 10,000 acres of irrigable land in the <br />Division; <br /> <br />6. Control of Gila River floodwaters into the Division <br />aquifer by acquisition of rights-of-way for flood <br />storage in, and modifying operating criteria of, the <br />Corps of Engineers' Painted Rock Reservoir; and <br /> <br />7. Fish and wildlife mitigation measures. <br /> <br />In addition, authurizeu feasibility studies of reject <br />replacement source alternatives will continue until <br />June 20, 1980. Also, development testing of pretreatment <br />processes and membrane desalting equipment will contine <br />at the Yuma Desalting Test Facility through module proof <br />testing in FY 1978 and high recovery pretreatment and <br />module testin9 in FY 1978-1979. <br /> <br />. <br /> <br />INVESTMENT COST: <br /> <br />Construction Cost <br /> <br />(October 1975 prices) <br /> <br />$ 229,870,000 <br /> <br />Yuma Desalting Plant <br />Bypass Drain-United States <br />Bypass Drain-Mexico <br />MODE Siphon <br />Wellton-Mohawk Irrigation <br />Efficiency Improvement <br />Program <br />Wellton-Mohawk Acreage <br />Reduction <br />Painted Rock Reservoir Land <br />Acquisition and Operation <br />Schedule Modification <br />Fish and Wildlife Mitigation <br />Measures <br />Yuma Desalting Test Facility <br />Reject Stream Replacement <br />Studies <br /> <br />Interest Durin9 Construction <br /> <br />. <br /> <br />Total Federal Investment <br /> <br />G <br /> <br />\ <br /> <br />$ 151,900,000 <br />8,300,000 <br />24,825,000 <br />3,600,000 <br /> <br />9,848,000 <br />15,000,000 <br /> <br />5,000,000 <br /> <br />2,357,000 <br />6,600,000 <br /> <br />2,440,000 <br /> <br />(5-5/8 percent) $ 23,330,000 <br /> <br />$ 253,200,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.