My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08016
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:48 PM
Creation date
10/12/2006 2:43:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8224.700
Description
Missouri Basin - Pick Sloan Project - Annual Operating Plans and Reports
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1967
Author
DoI, BoR
Title
Annual Operating Plan Western Division Missouri River Basin
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF TABLES <br /> <br />J!2~ <br /> <br />1 <br /> <br />Sunmlary of Planning Studies Compared to Actual <br />Operations for the 1967 Water Year , . , . , <br />Monthly Summary of Blue River Operations. , , , <br />Summary of North Platte Storage Ownership, Water <br />Year 1967 . . . . . . . . . . . . .. . . . . .. <br />Annual Operating Plan Studies for Water Year 1968 <br />Annual Operating Plan Studies of Green Mountain <br />Reservoir, Water Year 1968 <br />Reservoir Data. .".. . . . .. . <br />Power and Pumping Plant Data <br />Maintenance Outage Schedule , <br /> <br />2 <br />3 <br /> <br />4 <br />5 <br /> <br />6 <br />7 <br />8 <br /> <br />LIST OF EXHIBITS <br /> <br />~ All following page 54 <br /> <br />1 Interconnected Power System Map <br />2 System Generation <br />3 Buffalo Bill Reservoir Operation <br />4 Boysen Reservoir Operation <br />5 Pilot Butte Reservoir Operation <br />6 Seminoe Reservoir Operation <br />7 Pathfinder Reservoir Operation <br />8 Alcova Reservoir Operation <br />9 Glendo Reservoir Operation <br />10 Guernsey Reservoir Operation <br />11 Green Mountain Reservoir Operation <br />12 Willow Creek Reservoir Operation <br />13 Granby Reservoir Operation <br />14 Operation of Shadow' Mountain Reservoir and Grand Lake <br />15 Distribution of Adams Tunnel Imports <br />16 Carter Lake Operation <br />17 Horsetooth Reservoir Operation <br />18 Irrigation Deliveries <br />19 Generation by Plants <br />20 System Load and Generation <br />21 Inflow Available to Green Mountain Reservoir <br />22 Undepleted Natural Inflow Available to Granby <br />Reservoir <br />23 Inflow Available to Seminoe Reservoir <br />24 CompariSon: between ',Mnual, Inflows to Granby, Green <br />Mountain and Seminoe Reservoirs <br />25 Annual Inlow Probability <br /> <br />vii <br /> <br />Page <br /> <br />44 <br />46 <br /> <br />47 <br />49 <br /> <br />50 <br />51 <br />52 <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.