Laserfiche WebLink
<br />'.. ~.<! <br />,'") <br />Ol,,'" <br />Q <br />C") <br />-' <br />a <br /> <br />~laxwell (McDowell) Power-Pumping Plant <br />Tucson Aqueduct (Colorado source) <br /> <br />Buttes Dam and Reservoir <br /> <br />Charleston Dam and Reservoir <br /> <br />Tuc son Aqueduct (San Pedro source) <br /> <br />Hooker Dam and Reservoir <br /> <br />Transmission system <br /> <br />Distribution systems <br /> <br />Drainage and reuse facilities, <br />Additional works <br /> <br />Project Operation and Administration <br /> <br /><, <br /> <br />Power Requirements, Service, and Production <br /> <br />Power Market Requirements <br /> <br />Cost Estimates <br /> <br />Construction considerations <br /> <br />Design and cost considerations <br />Capital cost estimates <br /> <br />Operation, maintenance, and replacement cost estimates <br /> <br />CHAPTER V - ECONOMIC AND FINANCIAL ANALYSES <br /> <br />: . <br /> <br />Agricultural Economy <br />Economic Justification <br /> <br />Irrigation benefits <br /> <br />Municipal and industrial benefits <br />Fish and wildlife benefits <br /> <br />Flood control benefits <br /> <br />iv <br /> <br />~ <br />44 <br />44 <br />44 <br />45 <br />45 <br />45 <br />45 <br />46 <br />47 <br />47 <br />47 <br />48 <br />49 <br />50 <br />50 <br />50 <br />52 <br />52 <br /> <br />56 <br />56 <br />58 <br />58 <br />60 <br />61 <br /> <br />61 <br />