My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07999
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:43 PM
Creation date
10/12/2006 2:43:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.200
Description
Federal Reserved Water Rights - USFS - Water Division 2 - Negotiating Principles and Settlement
State
CO
Basin
Arkansas
Water Division
2
Date
8/21/1996
Author
Unknown
Title
Technical Workgroup - Stream Survey - August 21 1996
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />000177 <br /> <br />NATIONAL FOREST RESERVED WATER RIGHT CLAIMS <br />COLORADO WATER DIVISION 2 <br />TECHNICAL WORKGROUP <br />STREAM SURVEY <br /> <br />SURVEY DATE: AUl!ust 21. 1996 <br />STREAM NAME: Chalk Creek STREAM NO: 75A <br />SURVEY PARTICIPANTS: See attached attendance list <br /> <br />USFS CLAIM: Revised, Broken into 3 new claims <br />QP: 1. North Fork Chalk Creek 100 feet above <br />inholding boundary in Sec 32, T 15S. R80W <br />2. Chalk Creek above St. Elmo 100 feet above <br />east section line ofSec 12. T51N, R5E <br />3. Baldwin Creek at County Rd 162 in <br />Sec 30. T15S. R79W <br />WATER RIGHTS: <br />Number of Absolute: <br />Number of Conditional: <br />ExchangeIReplacement Potential: <br />Estimate Amount: <br />Time of Year: <br />Existing Instream Flow: 18 cfs year roundfrom NF Chalk Creek to County RD 162 <br />Bridge in Sec 19, TJ5S, R78W. <br />Current Water Right Administration: (Le. calledlfutile call1none) <br />RESERVOIRS: <br />Number of Existing: I at Alpine & numerous small lakes. Size AF: <br />Number of Potential Sites: Only small sites Size AF: <br /> <br />Amount: NF Chalk Ck 8 cfs year round <br />Chalk Ck above St. Elmo-Identify <br />Baldwin Ck - 1demify <br />CWCB instream flows okay when <br />derermined. Also want flushing <br />flows on NF Chalk & Chalk only. <br /> <br />Net Amount: <br />Net Amount: <br /> <br />CLIMATE: <br />Weather Station: <br />Average Precipitation: <br />Snow Course: <br />Average May 1 Depth: <br />Average May 1 Water Content: <br /> <br />LAND USE: <br />Topography: <br />7.5 Quad Maps: <br />Average Slope: <br />Slope Stability Problems: <br />Soil Type: <br />Federal Acres: 85% <br />Private Acres: 15% inholding and mining claims at old QP. Less than 5% at new QP' s. <br />Zoning: None <br />USFS Management Unit: <br />Future DevelopmentlUse Potential: <br />Type: Mining claim and summer home development at St. Elmo & Alpine <br /> <br />:5 (lOtV;1/ (J~~ ,~\ 00 ~ s 0--- f' -e. c.... pro..b I e ,"'Y\, <br /> <br />fl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.