Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />November 1982 <br /> <br />Financial Analysis Guidelines <br /> <br />The following guidelines are provided to assist in <br />formulating the financial analyses for the S.B. 439 planning <br />studies. please contact the CWCB staff if you have any questions <br />as to how the financial analyses are to be performed for the <br />study you are conducting. If you think a variation from these <br />guidelines is in order, please discuss it first with the staff. <br /> <br />1. Total Capital Cost Estimates <br /> <br />Estimates will be prepared of the "total capital cost" of <br />each alternative in each study. These capital cost estimates will <br />be displayed in an itemized manner in the draft final report <br />without escalation for inflation during planning and construction <br />and without interest for short term construction financing. All <br />costs will be expressed in constant, January, 1982 dollars. <br /> <br />2. Financing Approaches <br /> <br />Using the preceding total capital cost estimates as a base, <br />estimates of "total investment costs" and "total annual costs" <br />will be illustrated for each alternative by using two assumed <br />financing approaches: <br /> <br />a. State Funding Approach--This approach assumes that a <br />project would be authorized and funded by the Colorado <br />General Assembly through the Colorado Water <br />Conservation Board construction fund. Costs for short <br />term construction financing will not be included. <br /> <br />A reasonable schedule of pre-construction and <br />construction activities will be developed beginning <br />with the assumed initiation of planning and feasibility <br />studies in mid-1983 and terminating with the assumed <br />on-line date of the project. Expenditures for all <br />activities will be staged and escalated for inflation <br />at a rate of eight percent per year throughout the <br />planning and construction period. The total of all <br />escalated expenditures will be displayed as the "total <br />investment cost." <br />