My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07981
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:39 PM
Creation date
10/12/2006 2:42:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
11/1/1982
Title
Economic Evaluation Procedures Phase II Cache la Poudre Project Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />November 1982 <br /> <br />Financial Analysis Guidelines <br /> <br />The following guidelines are provided to assist in <br />formulating the financial analyses for the S.B. 439 planning <br />studies. please contact the CWCB staff if you have any questions <br />as to how the financial analyses are to be performed for the <br />study you are conducting. If you think a variation from these <br />guidelines is in order, please discuss it first with the staff. <br /> <br />1. Total Capital Cost Estimates <br /> <br />Estimates will be prepared of the "total capital cost" of <br />each alternative in each study. These capital cost estimates will <br />be displayed in an itemized manner in the draft final report <br />without escalation for inflation during planning and construction <br />and without interest for short term construction financing. All <br />costs will be expressed in constant, January, 1982 dollars. <br /> <br />2. Financing Approaches <br /> <br />Using the preceding total capital cost estimates as a base, <br />estimates of "total investment costs" and "total annual costs" <br />will be illustrated for each alternative by using two assumed <br />financing approaches: <br /> <br />a. State Funding Approach--This approach assumes that a <br />project would be authorized and funded by the Colorado <br />General Assembly through the Colorado Water <br />Conservation Board construction fund. Costs for short <br />term construction financing will not be included. <br /> <br />A reasonable schedule of pre-construction and <br />construction activities will be developed beginning <br />with the assumed initiation of planning and feasibility <br />studies in mid-1983 and terminating with the assumed <br />on-line date of the project. Expenditures for all <br />activities will be staged and escalated for inflation <br />at a rate of eight percent per year throughout the <br />planning and construction period. The total of all <br />escalated expenditures will be displayed as the "total <br />investment cost." <br />
The URL can be used to link to this page
Your browser does not support the video tag.