My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07981
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:39 PM
Creation date
10/12/2006 2:42:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
11/1/1982
Title
Economic Evaluation Procedures Phase II Cache la Poudre Project Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />specified, the "with and without" approach to estimating project <br />effects will be used throughout. The non-monetary effects of <br />such projects will not be taken into account in these economic <br />evaluations. <br /> <br />It is recognized that techniques do exist for imputing <br />monetary values to certain classes of non-marketed effects. Such <br />techniques will not be used because of budgetary limitations. <br />Similarly, techniques are available for estimating the indirect <br />benefits and costs of proposed projects. The costs of utilizing <br />the more reliable techniques of this kind also preclude their <br />use. <br /> <br />All benefits and costs shall be expressed in constant <br />January, 1982, price levels. <br /> <br />Project Costs <br /> <br />project costs shall consist of all costs defined in Task 12, <br />activity b, and interest during construction (IDC). It is these <br />streams of costs which shall be discounted when benefit-cost <br />ratios and break-even values are computed. <br /> <br />Project Benefits <br /> <br />Estimates of the benefits accruing from peaking and <br />non-peaking hydropower generation, new storage for municipal and <br />industrial use, new water supplies for supplemental irrigation, <br />and new storage space for the improved management of waters <br />already developed and used for irrigated agriculture shall be <br />made pursuant to the procedures described below. Flood control <br />benefits shall not be estimated. <br /> <br />~dropower Benefits (peaking). The alternative cost <br />approach to estimating peaking power benefits was used in Phase <br />I. While the informal canvas of utility load projections made <br />during Phase I is helpful, it does not constitute a credible test <br />of effective demand. There is reasonable doubt whether the <br />demand for peaking capacity will be sufficient to ensure that the <br />project would be used solely for that purpose. <br /> <br />This uncer.tai.nty stems from many possibi.lities, among them <br />that by 1989 WAPA may have contracted to market hydropower from <br />Reclamation projects as peak or' intermediate power, thereby <br />adding greatly to available regional peaking capacity and that <br />the potential effects of load mani'lgement and diversity exchange <br />policies upon future demand for peaking power may have been <br />underestimated in area utility forecasts. <br /> <br />The price for peaking power is an obvious element in <br />determining how much of such power will be consumed. The utility <br />load projections used in Phase I to confirm the existence of <br />effective demand did not include explicit consideration of this <br /> <br />-3- <br /> <br />.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.