Laserfiche WebLink
<br />- .. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />! . <br />, ~ 1 -, <br />, , (j. '.r <br /> <br />OPE RAT IN G P R IN C I P L E S. <br />--------- ---------- <br /> <br />!l!.!..!!..!.~~~ E.~!:! ^.!!.E. l!~!?~l!Y.Q.!.l! PB..QiEC! <br /> <br />Preamb Ie <br /> <br />The Trinidad Dam and Reservoir Project as reported in House <br />Document No. 325, 84th Congress, 2d Session, and as authorized by <br />the Flood Control Act of 1958, will be operated in such a manner <br />as to secure the greatest practicable benefits from the regulation <br />i <br />and use of the flows of the Purgatoire River consistent With the \ <br />laws and policies of the State of Colorado and of the United States \ <br />including the Arkansas River Compact. The objectives and principles \ <br />governing the operation of the Trinidad Dam and Reservoir Project <br />to secure such benefits are contained within the following articles. \ <br />.\ <br />\ <br /> <br />Article I <br />Article II <br />Article III <br />Article IV <br />Article V <br />Article.vr <br /> <br />OBJECTIVES <br />- DEFINITION OF TEEMS <br />- FLOOD CONTROL <br />IRRIGATION <br />- FISHERY AND RECREATION <br />REVIEW. AND AMENDMENT <br /> <br />Article I <br /> <br />OBJECTIVES.. <br /> <br />The operation of the Trinidad Dam and Reservoir involves the regu- <br />lation of the flows of the Purgatoire River for flood control, irri~ <br />gation uae, and recreation including a pennanent fishery pclol. The <br />project plan provides for: <br /> <br />1. Control of floods originating above the reservoir for . <br />benefit of the Cit~ of Trinidad and downstream reaches. <br /> <br />~. Optimum beneficial use. of the available water for irri- <br />~ation Within the project area consistent With the pro- <br />tection of downstream non-project rights as set forth <br />in Houae Document No. 325, 84th Congress, 2d Session, <br />which provides: <br /> <br />----'..--- <br />