My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07978
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:39 PM
Creation date
10/12/2006 2:42:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.100
Description
Trinidad Project - Studies - Operation Studies
State
CO
Basin
Arkansas
Water Division
2
Date
1/1/1996
Author
CWCB
Title
Trinidad Background Info Notebook Part 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />with Kansls7>1i. t.iie issue to review the irrigated lands and identified the additional issue to amend <br /> <br /> <br />the operating principles to allow the City of Trinidad to change the use of its Project water rights <br /> <br />from irrigation to municipal and industrial purposes. <br /> <br />After analyzing the issues that were requested to be reviewed, Reclamation determined the <br /> <br />following issues should be reviewed: <br /> <br />I. Review the water supply impacts of the allocation of the excess storage <br /> <br />capacity to the permanent fishery pool capacity and provide for filling and <br /> <br />maintaining the permanent fishery pool. <br /> <br />2. Release and delivery of stock water during the non-irrigation season. <br /> <br />3. IdentifY and designate the Districts' irrigable lands. <br /> <br /> <br />4. Hydrologic Operations. <br /> <br />5. Other issues reviewed: determination of canal and lateral losses and irrigation <br /> <br />requirements; Trinidad's change of use of Project water rights; and conditions (d) <br /> <br />and (e) ofH. D. No. 325. <br /> <br /> <br />6. Review recommendations of the previous review and include applicable <br /> <br /> <br />recommendations in this review. <br /> <br />B. Methodology <br /> <br />The District and Kansas requested the review be conducted using the same methodology <br /> <br />as used in the previous review. The District requested that the review include the Colorado water <br /> <br />years 1985 through 1994 while Kansas requested the review period should include all Colorado <br /> <br /> <br />water years from the beginning of Project operations in 1979 to present which would have been <br /> <br />through October 31, 1995. Since Reclamation used a simulation model which duplicated the pre- <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.