Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />GROUP C - PLANS THAT REQUIRE INSTITUTIONAL CHANGES <br /> <br />I <br /> <br />These plans require changing treaties, legislation, or the way <br />water is managed throughout the Colorado River Basin. <br /> <br />I <br /> <br />Plan C-l. Comoensate Mexico. <br />Cost $35.5 million, TVS 999 points, Category V. <br /> <br />I <br /> <br />Operation of the YDP would be terminated. During years when <br />water quality would normally require production from the YDP, <br />arrangements would be made to compensate Mexico for lost crop <br />yield resulting from use of poorer quality water. This would <br />require readdressing provisions of Minute 242. Since all <br />drainage water would be returned to the Colorado River, Arizona <br />would not lose return flow credits. <br /> <br />I <br /> <br />I <br /> <br />Advantages: <br />"None. <br /> <br />I. <br /> <br />Disadvantages: <br />"Difficult to administe~ and dete~mine losses and compensation. <br />.Opposition from Mexico would be expected. <br />.Probable high cost. <br /> <br />I <br /> <br />Plan C-2. <br />Cost $39.5, <br /> <br />Comcensate Arizona. <br />TVS 890 points, Category <br /> <br />v. <br /> <br />I <br /> <br />I <br /> <br />Operation of the YDP would be terminated. Drainage water would <br />either be bypassed to the Santa Clara Slough or recycled and <br />mixed with Colorado River water for reuse in southern Arizona. <br />Arizona would be compensated for losses caused by reduction in <br />return flow credits and/or production lost by using recycled <br />drainage water. Administration of the plan appears difficult and <br />strong opposition to this plan is considered likely. <br /> <br />I <br /> <br />I <br /> <br />Advantages~ <br />"Does not require reopening negotiations with Mexico. <br />Disadvantages: <br />.Loss of water in Basin (if bypassed) . <br />.Opposition from State of Arizona expected. <br />"Difficult to administer. <br />.High cost. <br /> <br />I <br /> <br />I <br /> <br />Plan C-3. <br />Cost $12.4 <br /> <br />Neaotiate Maximum Allowable Salinitv Level <br />million, TVS 1005 points, Category IV. <br /> <br />at NIB. <br /> <br />I <br /> <br />Through Negotiations with Mexico, <br />be changed. Adherence to the 115 <br />differential would not be required <br />exceeded 1,000 p/m. The 1,000 p/m <br /> <br />provisions of the Minute would <br /><:1:. 30) p/m salinity <br />until the salinity at NIB <br />assumes the standard of 879 <br /> <br />I <br /> <br />34 <br /> <br />I <br />