Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />2. It was assumed that full-time operation of the YDP would <br />be based on production at full capacity for a maximum of 330 days <br />each year, with 35 days allotted for maintenance time and outages <br />(a gO-percent operating efficiency) . <br /> <br />I <br /> <br />I <br /> <br />3. The YDP was assumed to be operated at 1/3, 2/3, or full <br />capacity. <br /> <br />4. If the water yield from a specific plan reduced the <br />required capacity of the YDP, it would be operated for the <br />required number of days each year to produce the required yield <br />at the closest assumed capacity (1/3, 2/3, or full), and the rest <br />of the year the YDP would be assumed to be in a standby mode. <br /> <br />I <br /> <br />I <br /> <br />5. If the YDP's estimated required capacity was at or less <br />than the 1/3 or 2/3 capacity, a module representing unused <br />capacity would be scrapped and a salvage value for the excess <br />module would be assumed. <br /> <br />I <br /> <br />I <br /> <br />6. Membrane replacement estimates assumed for full capacity <br />are $6 million annually, the biocide material for the storage of <br />the membranes wou~d be $1 mil~ion, and the non-contract cost <br />would be $430,000 annua~ly. If the required YDP capacity <br />utilized either the 1/3 or 2/3 capacity increments these costs <br />were proportioned accordingly. <br /> <br />I <br /> <br />I <br /> <br />7. For any plans that did not require the use of the YDP <br />under any circumstances, a salvage value was estimated. <br /> <br />I <br /> <br />B. If the certainty of YDP operation was questionable, or <br />the water yields varied from year to year for a given plan, the <br />YDP was assumed to be in the standby mode and the standby costs <br />were included. <br /> <br />I <br /> <br />9. Annual operating costs include costs for reject stream <br />replacement water at a rate of $123 per acre-foot, the current <br />estimate for providing reject stream replacement water by lining <br />the All-American Canal (AAC). <br /> <br />I <br /> <br />10. Power costs for the operation of any plan was assumed <br />to be at a rate of 50 mills per kilowatthour (kWh), except where <br />otherwise specified for plans involving special power purchasing <br />options. <br />11. Land purchase costs were based on the current price of <br />land in the particular area as ascertained by telephone calls and <br />other information. The cost of leasing land and the purchase of <br />water rights was obtained from other current Reclamation studies. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />12. The annual cost for all <br />life and 8-7/8 percent interest. <br /> <br />plans is based on a 30-year <br />Not all plans have a 30-year <br /> <br />I <br /> <br />10 <br />