Laserfiche WebLink
<br />0590 <br /> <br />'kJJ- fXU# ~ wkd euu/, ~ ~ ? <br /> <br />Under Federal laws, certain allocated costs of Reclamation <br /> <br />projects are nonreimbursable and the cost is absorbed as a desirable <br /> <br />Federal investment. Certain other allocated costs are reimbursable <br /> <br />by the direct beneficiaries--some are reimbursable without interest <br /> <br />while others are interest-bearing. <br /> <br />For the Narrows Unit, all costs allocated to flood control <br /> <br />and to road relocation are nonreimbursable. All allocated joint <br /> <br />costs (such as dam and reservoir costs allocated to the purpose) <br /> <br />and one-half of the separable costs (such as lands and buildings <br /> <br />specifically for the particular purpose) for fish and wildlife <br />and for recreation are likewise nonreimbursable, <br /> <br />All costs allocated to irrigation are reimbursable without <br /> <br />interest. One-half of the separable costs and associated interest <br /> <br />during construction allocated to fish and wildlife and to <br /> <br />recreation is reimbursable with interest. <br /> <br />The next tabulation presents reimbursable and nonreimbursable <br /> <br />costs allocated to the appropriate project purpose. It should be <br /> <br />understood that "reimbursable annual OM&R" for fish-wildlife and <br /> <br />recreation really means that those costs will be incurred by and <br /> <br />will be the responsibility of the agency operating the lands, <br />facilities, and water surface for fish-wildlife and recreation <br /> <br />(probably the Colorado Department of Game, Fish and Parks). <br /> <br />16 <br />