My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07957
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:35 PM
Creation date
10/12/2006 2:41:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.100
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/21/1983
Title
Grand Valley Salt Pickup Calculations - Draft Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" <br />t..... <br />l.;-' <br />,-. <br />-" <br /> <br />':7" <br /> <br />."-' <br />-' <br /> <br />. <br /> <br />. <br /> <br />Card <br /> <br />I <br /> <br />2 <br /> <br />3-EOF <br /> <br />Description of Variables <br /> <br />Title <br /> <br />Format: (8AIO) <br /> <br />STATON,BMOF,BYRF,EMOF,EYRF <br /> <br />Where: <br /> <br />STATON = 8 character station 1D <br /> <br />BMOF = month number of beginning month <br /> <br />of flow <br /> <br />BYRF = beginning year of flow <br /> <br />EMOF = ending month of flow <br /> <br />EYRF = ending year of flow <br /> <br />Format: (8X,A8,8X,2(12,2X,12)) <br /> <br />FLYR,FLMO,(DFLO(1),1=1,32) <br /> <br />Where: <br /> <br />FLYR = year of flow data on these four cards <br /> <br />FLMO = month of flow data on these four cards <br /> <br />DFLO = array containing a month of me,an daily flows <br /> <br />Format: (18X,212,2X,8F7.0)/,(24X,8F7.0)) <br /> <br />B. File ''MP'' contains the missing periods of flow d,ata. Every day <br /> <br />containing a zero or blank in file "DFLO" is treated as a dry <br /> <br />event. If the uaer wants that zero to be interpreted instead as <br /> <br />missing data, he must enter the starting and ending dates of the <br /> <br />missing period. <br /> <br />A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.