My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07946
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07946
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:31 PM
Creation date
10/12/2006 2:41:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449
Description
South Platte Projects - Hardin Dam
State
CO
Basin
South Platte
Date
12/1/1982
Author
Dames and Moore
Title
Hardin Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />of the on-line date of the proj ect (1993). <br />expressed in January 1982 dollars. <br /> <br />These annual costs were also <br /> <br />I <br />I <br />II <br />I <br />l' <br />J <br />l <br />,..1 <br />~. <br /> <br />Total annual costs were then estimated by adding the annual amortization <br /> <br /> <br />requirement to the annual costs of operation, maintenance and replacement as <br /> <br />Finally, the annual costs were divided by the annual yield of the project <br /> <br /> <br />(100,000 ac-ft at a 90 percent level of reliability) to obtain an annual cost <br /> <br /> <br />per ac-ft of yield. The following table summarizes the total capital costs, <br /> <br />total investment costs, annual costs and costs per ac-ft of yield for the two <br /> <br /> <br />funding approaches and for each alternative project. <br /> <br /> CWCB Funding Approach Bonding Approach <br /> w/Flood 101/0 Flood w/Flood 101/0 Flood <br /> Control Control Control Control <br />I Total Capital Cost1 $290,567,000 $262,999,000 $297,941,000 $269,662,000 <br />I Total Investment Cost2 $497,683,000 $450,467,000 $854,594,000 $773,481,000 <br />Annual Cost 19933 $ 29,111,000 $ 26,356,000 $ 93,464,000 $ 84,601,000 <br />I Annual Cost Jan 19824 $ 11,560,000 $ 10,466,000 $ 37,115,000 $ 33,595,000 <br />Annual Cost per <br /> Ac-ft Yield <br /> 1993 $290 $260 $930 $850 <br /> Annual Cost per <br /> Ac-f t Yield <br /> Jan 1982 $120 $100 $370 $340 <br /> <br />3Annual cost is the sum of the annual amortization requirement <br />plus operation, maintenance and replacement as of 1993. <br /> <br />4Annual cost expressed in January 1982 dollars. <br /> <br />(de bt service),.. <br />,. <br /> <br /> <br />lConstruction Costs in January 1982 dollars. <br />under "Bonding Approach." <br /> <br />2Consttuction costs escalated for inflation from 1982 to 1993. Under "Bonding <br />Approach," costs of short-term construction financing and a bond reserve <br />fund are included. <br /> <br />Bonding Costs are included <br /> <br />viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.