Laserfiche WebLink
<br />,,- <br /> <br />. <br /> <br />f <br />. <br />.' <br />. <br /> <br />. <br /> <br />, <br />r.- <br /> <br />34 <br /> <br />(" ~~.. 1 <br />t. tJ ..L t..;. <br /> <br />having a high line b'cilt for the re~sons statod in the board <br /> <br />raport above referred to. The cons'Gruction of a high linG canal <br /> <br />is providGd for in a contr~ct with the United States dated <br /> <br />October 23, 1918. In addition' t'o this tho District is pledged <br /> <br />to connection with thc Laguna Dam by contract with the Yuma County <br /> <br />Water Users' Associ~tion in ordor to tonnir~te the ~angerous <br /> <br />pact ice or ~intaining " diversion dam ~t Hanlon Heading. <br /> <br />This connection snould be @ade at the earliest possible dat~ <br /> <br />in accordence with the existing ur.derstandings and contr~ctS. <br /> <br />The distribution of tho cost of tho high line c?~,l would b~ <br /> <br />according to the following table: <br /> <br />Cost of Hi gh Line C~.nal. <br /> <br />To connect wi th d= <br />Canal. <br /> <br />$1,843,000 <br />28, 9:JQ... oeo <br />30,773,000 <br /> <br />Division of Costs of Canal. <br /> <br />Yuma project by contract <br />Remainder for Imperial Valley <br /> <br />980,000 <br />29,793,000 <br /> <br />Divided as follows by acreage benefited: <br />Imporial district 515,000 acres <br />Extensions in U.S. 270,000 n <br />II II Mexico 30,000 n <br />815,000 n <br />Cost per acre Imperial Valley - $36.55 <br /> <br />18,826,000 <br />9,870,000 <br />1, 097 .000 <br />29,793,000 <br /> <br />Division of Costs of Pewer Installation Alon~ Canal. <br /> <br />Plant No. 1 <br />n II 11 <br /> <br />$1,380, JOG <br />1,927.000 <br />$3,307,000 <br /> <br />Divided as follows: <br />Yuma project <br />Imperial District <br />Pumping <br /> <br />$528,000 <br />2,051,000 <br />728,000 <br /> <br />$3,307,000 <br />