Laserfiche WebLink
<br />Introduction <br /> <br />The operation of the Colorado River Basin during the past <br />year and the projected operation for the current year reflect <br />flood contro~ river regulation, beneficial consumptive uses, <br />hydroelectric power generation, water quality contro~ <br />enhancement of fish and wildlife, recreation, and Colorado <br />River Compact requirements. <br /> <br />Storage and release of water from the Upper Basin <br />reservoirs are governed by all applicable laW!; and <br />agreements concerning the Colorado River, including the <br />impoundment and release of water in the Upper Basin <br />required by Section 602(a) of the Colorado River Basin <br />Project Act of September 30, 1968 (Public Law 90(537). The <br />operation of the Lower Basin reservoirs reflects Mexican <br />Treaty obligations and Lower Basin contractual <br />commitments. <br /> <br />Nothing in this report is intended to interpret the provisions <br />of the Colorado River Compact (45 Stat. 1057), the Upper <br />Colorado River Basin Compact (63 Stat. 31), the Water <br />Treaty of 1944 with the United Mexican States (Treaty <br />Series 994, 59 Stat. 1219), the United States/Mexico <br />agreement in Minute No. 242 of August 30, 1973, (Treaty <br />Series 7708; 24 UST 1968), the Decree entered by the <br />Supreme Court of the United States in Arizona v. California <br />et aI. (376 U.S. 340), the Boulder Canyon Project Act (45 <br />Stat. 1057), the Boulder Canyon Project Adjustment Act (54 <br />Stat. 774; 43 U.S.c. 618a), the Colorado River Storage <br />Project Act (70 Stat. 105; 43 U .S.C. 620), the Colorado River <br />Basin Project Act (82 Stat. 885; 43 U.S.C. 1501), the <br />Colorado River Salinity Control Act (88 Stat. 266; 43 U.S.C. <br />1951), or the Hoover Power Plant Act of 1984 (98 Stat. <br />1333) . <br /> <br />\ <br /> <br />Authority for Report <br /> <br />Pursuant to the Colorado River Basin Project Act (Public <br />Law 90(537) of 1968, I am pleased to present to the <br />Congress, and to the Governors of the Colorado River Basin <br />States, the twenty-fourth annual report on the Operation of <br />the Colorado River Basin. <br /> <br />This report describes the actual operation of the reservoirs <br />in the Colorado River drainage area coostructed under the <br />authority of the Colorado River Storage Project Act, the <br />Boulder Canyon Project Act, and the Boulder Canyon <br />Project Adjustment Act during water year 1994, and the <br />projected operation of these reservoirs during water <br />year 1995, under the .Criteria for Coordinated Long-Range <br />Operation of Colorado River Reservoirs,' (Operating <br />Criteria) published in the Federal Relrister June 10, 1970. <br /> <br />The Operating Criteria and Section 602 of Public Law <br />90-537 mandate consultation with representatives of the <br />Governors of the seven Basin States and the Upper <br />Colorado River Commission relative to annual plans for <br />operation of the Colorado River reservoirs. The 1995 <br />Annual Operating Plan (AOP) was prepared by the Bureau <br />of Reclamation in consultation with the Governors' <br />representatives of the seven Basin States, the Upper <br />Colorado River Commission, other Federal and State <br />agencies, and the public interests. <br /> <br />Bruce Babbitt, Secretary <br />United States Department of the Interior <br /> <br />1 <br />