My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07869
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:16 PM
Creation date
10/12/2006 2:38:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.600
Description
Colorado Big Thompson Project - Studies
Basin
South Platte
Water Division
1
Date
12/19/1984
Title
DRAFT - Green Mountain Reservoir Water Marketing Hydrology Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />, <br /> <br />. <br /> <br />o <br />C) <br />N <br />~,.... <br />~ <br />Ul <br /> <br />90 <br /> <br />. <br /> <br />. <br /> <br />Generation in Gigawatthours. Generation (energy in <br />gigawatthours) is computed as a function of storage in <br />Green Mountain Reservoir and discharge through Green <br />Hountain'Powerplant. No energy is generated when the <br />average discharge is less than 100 ft3/s. <br /> <br />91 Generation Capacity in Megawatts. Generation capacity <br />(in megawatts) of Green Mountain Powerplant for this <br />study is computed as an average value per month based <br />on the energy generated. The plant is not used for <br />peaking because there is no afterbay, hence the full <br />capacity of the powerplant is not available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.