Laserfiche WebLink
<br />C <br />C:J <br />N <br />....... <br />c..) <br />o <br /> <br />47 <br /> <br />48 <br /> <br />47 <br /> <br />65 <br /> <br />. <br /> <br />. <br /> <br />released for natural flow shortage in the period between April <br />15 of the preceding year and April IS of the current 'year. <br /> <br />In addition shortages could occur because of emptying the <br />useable power pool. If this occurred, natural flow releases <br />were shorted last. <br /> <br />Minimum Required Release from Green Mountain Reservoir. <br />The simulated minimum required reservoir release is com- <br />puted as the sum of the CBT Project replacement require- <br />ment, the bypass of inflow for downstream prior rights, and <br />the release to meet the downstream natural flow demand <br /> <br />(Line 47 · Line 44 + Line 45 + Line 46). <br /> <br />Release for Silt Project. The maximum demand on Green <br />Mountain Reservoir by the S11t Project is limited to a <br />total of 5.000 acre feet and distributed as follows. <br /> <br />Month Demand (Acre Feet) <br />April 200 <br />." <br />May 500 <br />June 1100 <br />July 1300 <br />August 1200 <br />September 500 <br />October 200 <br />