Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />.. <br /> <br />-4- <br /> <br />v. General <br /> <br />i. Maintenance liaison was continued \dth the Board of Directors <br />of the Conejos Water Conservan~ District and the interested water users <br />of the Rio Grande Division. <br /> <br />ii. No time was lost in the field during the period because of <br />inclement weather. <br /> <br />iii. TriO representatives of Power Utilization, Regional office, were <br />in the Project office for several days conferring on power problems of the <br />Se..11 Luis Valley. <br /> <br />~;dV'~~ <br /> <br />W. H. Sweet <br />Project EngL~eer <br /> <br />r - , r, .: yv <br />~... ..t~::' .... J <br />