<br />I
<br />
<br />. I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />'I
<br />
<br />!ll
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />1
<br />
<br />I
<br />
<br />D 00 3 H
<br />
<br />7-
<br />
<br />7619
<br />E-16
<br />PERMIT STATUS
<br />
<br />PERMIT /'10
<br />
<br />RES,
<br />
<br />Priority Date
<br />
<br />June 20. 1972
<br />
<br />Approval Dale r.en~r 10, 1 C'l74
<br />
<br />September 30. 1916 - Notice of expiration of ti~e for commencement of ~ork mailed to
<br />both pemit tees. }[C 221ft)
<br />
<br />October 19, 1976 - The State of Wyoming, Board of Land Commissioners is hereby
<br />removed as co-applicant of this permit, at the request of the
<br />Commissioner of Public Lands. See Miscellaneous Notices,
<br />Permit No. 7619 Res.
<br />
<br />..
<br />
<br />
<br />H. ADU DELL Otl c? ',::
<br />tant State Engineer
<br />
<br />December 30, 1976 -
<br />
<br />EXTENSION GRANTED~ IN RESPONSE 7'0 REOUEST RECEIVED December 17,
<br />1976. Time tor commencement of ~ork hes been extended to December
<br />31, 1978.
<br />
<br />JAMES ~u~~t \\~~~,~ 0 '
<br />
<br />Assistant Sto!llte Engineeznt'i 1 .. l....lr
<br />
<br />September 29, 1978 - Notice of eKpiration oE time Eor connencement of work and
<br />completion of construction mailed. ~ij~,~f~ SEP 30 '78
<br />
<br />Harch 3D, 1979 - EXTENSION GRANTED, IN RESPONSE TO REQUEST RECEIVED December 29,
<br />Time for conmencement of work has been extended to December 31,
<br />and time for completion of construction has been extended to
<br />December 31, 1979_
<br />
<br />1978.
<br />1979,
<br />
<br />,
<br />/
<br />./'
<br />
<br />-l(~aI2~
<br />
<br />'79 '" LAND AN RSON
<br />. Assistant State Engineer
<br />
<br />",c.o, l@ 2
<br />faum
<br />
<br />"
<br />
<br />September 28, 1979 - Notice of expiration of time for commencement of worK and
<br />
<br />comp1eticln of construction mailed. r.~!C~O.
<br />'"MEO SEP 2 i3 '79
<br />
<br />~
<br />
<br />December 6, 1979 -
<br />
<br />EXTENSION GRANTED, IN RESPONSE TO REQUEST REceIVED November 3D,
<br />Time for commencement of work has been extended to December 311
<br />and time for completion of construction has been extended to
<br />December 311 1980.
<br />
<br />1979.
<br />1980;
<br />
<br />;:'~i:::.;I, Jt).c '(''',
<br />Li...l",:'~ ...;,;:':
<br />
<br />
<br />eer
<br />
<br />NonCE
<br />
<br />(
<br />
<br />A Manual of RClulattoo.s pd II1S1ructiom for filinl appliutioos will be furnished by tbe: Statc EnliMCr'S Off," Upolll
<br />requut. By earefully complyiol wilb lhe: insuuctions coolained io Ihe M.aaual. tnl.lch trouble and delay will be. u....ed lbe applj.
<br />ani, the proCeuional ealinecr or land Wl'Yl:)'Or, and Ihe Slate Enlincer"a Deface.
<br />
<br />This applicalion musl be aecomp&llicd by maps in duplicale. prepared La aecordancc witll lhe Manual, a.od by a liliq
<br />lee oC Two Oollan ($2,00).
<br />
<br />Applications retllrned Cor corrccl1ona InUII be resubmincd 10 the Slate EoJinccr .nlbi.a 90 d.ys wilb Ibc: correction. pro~rJy
<br />made:; ol.hc:rwi.sc the filiol will be cane:c:le::d,
<br />
<br />This .pplication, wben 'PPfOYCd. dc>el no( constitllle a complete:: walet filht. It is )'OIU authorily 10 belin COIIslTllCtion work,
<br />which must be commenced wilhin ODe yur from lhe date of approval of dUs .pplicatioo.
<br />
<br />Notice oC c.ommel'M;Cme::nt of wort, completion of the work. de::&CI"ibc.d in the pennil, must be filed in t:be State Enlincc::n Off,"
<br />before the cxpintion of the lime allowed in the:: pc::rmil,
<br />
<br />If ulensioos oC lime:: beYOnd tile lime limiu let forth in the:: pc:rmif an: required, rcquc:1lI Cor I,unc mun be La writi.al, .I.t.
<br />101 why lbe IlddiliooallUne is required, and mud be rcc.c::ived La the Slate Enl;iMer'l OffiCe before lbt:: expintion of the:: lime
<br />.11o'tllCd in the:: permit;
<br />
<br />To perfeCl your wSler ri&:bl, nOlif)' )'Our Water Divi,ion Superinlendenl that )'011 arC' re.d)' 10 allbmit Ciu.1 proof, Thit
<br />nOliec should be &Cnl 10 tbe 5l1perintenck:nl al 1000 as pouibk Ilter lhe terml of the pc.rmi( blve: been complied ",jth, When )'011
<br />hIVe IlIbmilled YOllr proof beCore the SlIperintendenl, il will be considered by the State Board of Control. and. it found 10 be
<br />tllisfaclory, Ihe Board will jug( 10 you a Ccnific.te:: of Construction wbich will COnstitllle a comp~led walel rilhl,
<br />
<br />The:: Iranliol of .. pelmit docl not conllitUle the:: ,'anlinl of rilht-of.w.)'. If &II)' rillu-of.way is necelsary in conMctiOn
<br />wilb 1he application it should be underst.OOd thai Ihis responsibililY II thc applicant'a,
<br />
|