Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />" <br /> <br />OOO!!t,,; <br /> <br />expenses of PRRC and Exxon in preparing the filing, doing the water supply studies, and <br /> <br /> <br />the dam design. The big difference in the Middle Fork filing and that for Three Forks <br /> <br /> <br />is that the Middle Fork water right predates the Yellowstone River Compact and thus <br /> <br /> <br />has inherent benefits not associated with the Three Forks Project, <br /> <br />Nevertheless, P & M has invested considerable funds in the Three Forks Project <br /> <br />and would want to be reimbursed. P & M data filed with the State Engineer of Wyoming <br /> <br />indicate that as of 1985 they had invested $401,000. By 1990 the investment is probably <br /> <br />equal to $580,000 or $10 per acre-foot of yield. <br /> <br />~ <br /> <br />16 <br />