My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07832
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:01:17 PM
Creation date
10/12/2006 2:37:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
2/27/1951
Author
CWCB
Title
Report of Policy and Review Committee with Proposed Principles of Operation - Appendix A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />> _ ~ '-j <br />li;;J. j <br /> <br />diversions for more efficient use during the irrigation season,. This <br /> <br />matter was discussed with the various Arkans~ Valley interests and as <br /> <br />.' <br /> <br />evidenced by appropriate resolutions, the people in the Arkansas Valley <br /> <br />have expressed a willingness to execute the'necessary agreements to permit <br /> <br />" <br /> <br />the more efficient use of water now being diverted to their lands in the <br /> <br />winter months by storing such water in the Pueblo Reservoir. <br /> <br />Simi~ar resolutions were adopted by the local interests with <br /> <br />respect to the storage, where pOSSible, in project reservoirs'in lieu of <br /> <br />inland reservoi,rs Vlhich have large evaporating areas. <br /> <br />~-- ---- <br />_ _ ~-The~co~:t~:~~~e=s-~th~~t~-e.:'l~~1l,~~~e-~~~ ~t~o }~c~'~~re effic~~nt--- ~ <br />u5'e ~orAr~'!I:1sasRiver wateJ;':,: ~nd :ot. -f~~~w~ter~fo -.Jhe~extentthcat.:they~ca:n--'~ <br />b;O:~~~se;"~~~ire_-~~~~~le-=ana ~r~~~;r;dL~~t -th;~~~;~~t~~e-Pla:n:e~ 'to- -c---_ <br /> <br />- -- - <br />----- <br /> <br />- -.-- <br />--------- <br /> <br />=----:::=-.~---:--~ <br />-- . <br /> <br />'------- <br />-------.. <br /> <br />attain these objectives. It was recognized that agreements will need be <br /> <br />exeeuted to effectuate these uses. <br /> <br />p~{er Production <br /> <br />To assist in financing.. the project an:i to generate firm energy <br /> <br />needed in the Arkansas Valley, the project contemplates a system of power <br /> <br />, <br /> <br />conduits and power plants located in the upper Arkansas Valley to develop <br /> <br />the power head between the outlet of the Frying Pan-Arkansas Twmel and <br /> <br />'. <br /> <br />Salida. The successful operation of this power system requires the with- <br /> <br />holding of certain quantities of storage for power purposes at the end of <br /> <br />the irrigation season in the Sugar Loaf and Twin Lakes Reservoirs in order <br /> <br />to insure the availability of water for firm power production in the winter <br /> <br />months. Storage so released is to be re-regulated in the Pueblo Reservoir <br /> <br />and exchanged during the following season for storage in the upstreSlll <br /> <br />_00" <br />
The URL can be used to link to this page
Your browser does not support the video tag.