My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07823
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:02 PM
Creation date
10/12/2006 2:37:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.200
Description
Narrows Unit - Mailing Lists Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1961
Author
US DoI BoR
Title
Site Selection Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-, <br /> <br />23~4 <br /> <br />Table 7 -- Construction and OM&R Costs <br />(in thousands of dollars) <br /> <br />" <br />, <br /> <br />Feature <br /> <br />Narrows Site <br />Construction OM&R <br /> <br />Weld County Site <br />Construction OM&R <br /> <br />l-li thout Bijou Con.oro1 <br /> <br />D:J.Dl & reservoir <br /> <br />38,334 <br /> <br />18.1 <br /> <br />.45,459 <br /> <br />lE3.1 <br /> <br />Bijou Control <br /> <br />Subtotal <br /> <br />1,369 <br />4,870 <br />6,239];,/ <br /> <br />10 , 50ci./ 16.3 <br /> <br />Dam & reservoir <br />Diversion lwrks <br /> <br />2.0 <br /> <br />2.0 <br /> <br />.10,500 16.3 <br /> <br />Total with Bijou Control <br /> <br />'.- <br /> <br />Total <br /> <br />39,703 <br />4,870 <br />44,573 <br /> <br />18.1 <br />~ <br /> <br />20.1 <br /> <br />55,959 <br /> <br />-34.4 <br /> <br />Dams & reservoirs <br />Diversion works <br /> <br />.55,959 <br /> <br />,34.4 <br /> <br />r'~' <br /> <br />Y Incremental cost of additional 3 feet on heiGht of Narrows Dam <br />and necessary dil,es and channelization. <br />?J Higgins Reservoir. <br /> <br />Benefit-cost Analysis <br /> <br />The total investments in the potential project works are converted <br />to annual eqUivalent costs for a useful life of 100 years with <br />interest at 2-k percent. PJmual OM&R costs are "chen added to deter- <br />mine total annual costs. Comparison of the total annual benefits <br />'lith the annual costs provides benefit-cost ratios. <br /> <br />A St\!ilJlJal'Y or the benefit-cost analysis is sha>>u on the nc::t page. <br />Certain conclusions may be drawn from this analysis. <br /> <br />CONCLUSIONS <br /> <br />.. <br />., <br /> <br />1. The benefit-cost ratios for both developments are above <br />unity; however, development at Narrows shows considerably greater <br />justification than the Weld County-Viggins complex and would <br />represent !lore economical use of Federal funds. Construction costs <br />at lveld County and Higgins Reservoirs are over $11,000,000 more <br />than that at Narrows, both controlling Bi~ou Creel,. Also, annual <br />operation and maintenance costs are over $14,000 more for the Held <br />County development. <br /> <br />.. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.