Laserfiche WebLink
<br />------ <br /> <br />06/16199 <br /> <br /> Hac Population estimate in the <br />2234 Be Vamoa River $21,000 $21,000 $21,000 $21,000 <br /> CDOW ISM? on Cclorado, White & Outvear hUmnback monitorina should be deleted. Inflation rates verY hiah. <br />22b BC y"m= $34,200 $34,200 $34,200 $36.400 $31,300 <br />22. BC UDWR, Salt lake City $169,300 $169,300 $169,'300 $221,100 $161,000 <br /> Need to evalvate statu::p~:o date and recomrnende future efforts. <br />22d 8C Razorback Basinwide Monitorino $50,000 $50.000 Budoet reduced to deYe on data collected 1996-1999. $220,000 $220,000 $216.000 <br /> Vampa, lower Green, & lower Colo. The Yampa is the highest prioritY of these stations, but we eliminated this <br />22f BC CPM larval abundaO(;e $0 I "ro'ect to balance the budQet. $108,900 $100,000 $76,800 <br /> Combine into single SOW to develop CPM pop. est. for Green River system <br />UNSOL BC Middle GreenfYamoa CPM non. est. $88,000 $88,000 indud(llCl Yam=- and White rivers',r(Comb;ned cost maY be reduced.) $88,000 NfA <br /> lower Green CPM POP. est Combine into single SOW to deV:0(CPM pop. est for Green RiI(er sYstem <br />UNSOL BC $79,700 $79,700 inc!udinl'l Yamoa and White rivers. Combined cost may be reduced.) $79,700 NfA <br /> EYals1 razorback sucker stocking $49,000 $52,800 <br />50 BC F'WS $49 000 $49,000 $49,000 <br />22" BC Assessrrnmt of ISMP $0 $0 $0 $10,000 <br /> Two proposals submitted: one from BaR and one from FWS. Boih SOWs <br /> focus 01"1 the 15-MR; but we need a cost-effective basinWide habitat <br /> monitoring program. Torn Czapla Will worlc with George Smith and Robert <br /> Habitat monitorina oroaram Wigington to make recommendations for a habitat monitoring program <br />NEW BC $0 durino~ FY 2000 focuslno on flow temoerature, and sediment. . $15000 $15,000 NfA <br />UNSOL BC CatQStornid kev $0 Not recommended Ilow orionM. $38 000 NfA <br /> E'IIal. ~\razOrback sucker stocking Not recommended lorema1Ure). <br />UNSOL BC UOWR $0 " $115500 NfA <br />VI. Infonnation, Education & Public Involvement <br />12 '&E Generallnfonnation and Education $45,000 $45,000 CoortIinated DUbHc involvement incoroorated into ttiis scope. $45 000 $45,000 $28,000 <br /> Based on new direction for Yampa Plan, I&E Cost will be bome by PO's <br />PIP-3 '&E Yamoa Maflaoement Plan PIP $0 office; also no river trio in FY 2000. $1000 $1,000 $1,000 <br /> Grand Vaney capItal Improvements <br />PIP-4 '&E p,p $30,000 $30,000 $30000 $30,000 $30,000 <br />PIP.S '&E Coord. Resv. Onerations PIP $3,800 $3,800 Colorado additJonal in-kind funds, $3800 $4,200 $4,200 <br /> Reclamation Westem Colorado Area Office funding allocated to support the <br />,p"" '&E Ruedi Reservoir PI? $10,400 $10,400 Recoverv Prooram. $10400 $10,000 $10,000 <br />IP.7 '&E Flaminn Game oOPration$ PIP $55,000 $55,000 Should be fn-kind funds from Provo lLike Rued! . $55 000 $28,000 $56.000 <br />,p"" '&E Floodolain restoration orooram PIP $0 Funds In /leodolain restoration oackaoe. $0 $16,900 $0 <br /> No saw Submitted. Bob Muth to work with Anita Martinez to develop a <br />IP.10 '&E Pond Redamation oublle Involvement $10,000 $10,000 PIP/SOWon this. $0 $10,000 $0 <br /> ~~h combined publk:. in....olvement <br />IP-12J13 '&E lrldudinn Duchesnel $0 No SOW submitted. $0 $200 $200 <br />IP-14 '&E Coordinated oublic inl(oIvement lncorooraled in Droiec:t #12 '0 $10,000 $10,000 <br />IP-15 '&E Asninall oneratiofl.S PIP $0 All costs borne bv Rectamatioo as in-klnd conbibutions. $0 $0 $0 <br /> , <br />ge4 <br /> " <br /> -- <br /> <br />~ <br />