Laserfiche WebLink
<br />. <br /> <br />C) <br />f~ <br />~ <br />C) <br /> <br />. <br /> <br />~, <br /> <br />SUMMARY (Continued) <br /> <br />actual expenditures to date and the estimated future disbursements are <br />shown below. <br /> <br />CH2M HILL contract <br />Basic investigation <br />Verification study <br />Monitoring <br />Reclamation (planning studies 1976-82) <br />Balance to complete final monitoring <br />(FY 1984) and report (FY 1985) <br />Total unit cost <br />Annual equivalent cost (100 years st 7 7/8 <br />percent) <br />Salinity reduction at Imperial Dam (mg/L) <br />Cost effectiveness ($/mg/L) <br /> <br />$250,000 <br />1,700,000 <br />30,000 <br />890,000 <br /> <br />160,000 <br />3,030,000 <br /> <br />239,000 <br />1.6 <br />149,000 <br /> <br />Monitoring of the conditions at Meeker Dome will continue through <br />FY 1984 except for some occasional monitoring of the chloride levels in <br />the White River beyond 1984. If, at the end of the monitoring period in <br />September 1984, the results continue to indicate that well plugging has <br />effectively reduced the salt contribution from the dome, the investiga- <br />tion will be terminated, snd a report which will include the final moni- <br />toring results will be prepared on the unit in FY 1985. <br /> <br />S-5 <br />