Laserfiche WebLink
<br />'i <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />IRRIGATION SERVICE AREAS (acres) <br /> <br /> Colorado New Mexico Total <br />,Full service land <br />Non-Indian 30,310 4,530 34,840 <br />Ind i an 13 ,400 380 13,780 <br />Subtotal 43,710 4,910 48,620 <br />Supplemental service land <br />Non-Indian 17,300 3,720 21,020 <br />Ind i an 460 460 <br />Subtotal 17,760 3,720 21,480 <br />Total 61,470 8,630 70, 100 <br /> <br />ESTIMATED COSTS <br /> <br />/----. <br />\ <br /> <br />Construction costs (January 1978 prices) <br />Ridges Basin Dam and Reservoir <br />Southern Ute Dam and Reservoir <br />La Plata Diversion Dam <br />Southern Ute Diversion Dam and Southern Ute <br />Inlet Canal <br />Durango Pumping Plant and Ridges Basin Inlet <br />Conduit <br />Ridges Basin Pumping Plant <br />Sprinkler pumping planl:S <br />Dry Side Canal and Long Hollow Tunnel <br />New Mexico Irrigation Canal <br />Durango Municipal and Industrial Pipeline <br />Laterals <br />Drains <br />Transmission lines and substations <br />Permanent operating facilities <br />Operation and maintenance housing <br />Recreational facilities <br />Wildlife land <br />Cultural resources program!1 <br />Operation and maintenance of future year <br />capacity <br />Total <br /> <br />$51,000,000 <br />24,000,000 <br />1,300,000 <br /> <br />7,300,000 <br /> <br />39,500,000 <br />30,000,000 <br />12,300,000 <br />54,000,000 <br />2,000,000 <br />1,250,000 <br />80,990,000 <br />5,140,000 <br />8,640,000 <br />4,200,000 <br />130,000 <br />6,000,000 <br />4,600,000 <br />3,000,000 <br /> <br />1,000,000 <br />336,350,000 <br /> <br />Annual operation, maintenance, and replacement <br />costs (1974-76 prices) <br />II The project authorization limits this amount to no <br />1 percent or the total project cost, The Bureau is seeking <br />authorization to exceed this amount. <br /> <br />2,137,000 <br />more than <br />Congressional <br /> <br />, <br /> <br />-~.. <br /> <br />, <br /> <br />4 <br />