Laserfiche WebLink
<br />.' <br />I <br />i <br /> <br />COST TO CITY OF DURANGO FOR PUMPING PROJECT I-lATER FROM <br />ANIMAS RIVER AND STORING IN RIDGES EASIN RESERVOIR: <br /> <br />(BASED UPON 8,200 AF/YR) (JAN. 1978 PRICES) <br /> <br /> TOTAL ANNUAL COSO PER <br /> COST LO 0 GAL. <br />PRINCIPAL & INTEREST AND $639,100 $.2392 <br />INTEREST DURING CONSTRUCTION <br /> Q <br />ANrWAL 'OM&R <br />A. POWER COST $ 3L 500 ' $. 0118 <br />B. . OTHER COSTS 35,500 .1)133 <br /> SUBTOTAL $ (67,000) ($.0251) <br /> TOTAL $706,100 $.2643 <br /> <br />, COST TO CITY OF DURANGO IN 1978 FOR PUMPING FROM ANIMAS <br />RIVER AND STORING IN PRESENT CITY RESERVOIR: (BASED UPON <br />1978 VOLUME PUMPED OF 207,961,462 GAL. OR 638 AF) <br /> <br />DEPRECIATION & AMORTIZATION <br />FOR PUMPS AND MOTORS <br /> <br />$15,000 <br /> <br />$.0721 <br /> <br />r <br /> <br />ANNUAL or1&R <br />A. POWER COST <br />B. OTHER COSTS <br /> <br />$28,150 <br />22,250 <br /> <br />$ . 135lJ <br />.1070 <br /> <br />TOTAL . <br /> <br />$65,401) <br /> <br />$.3145 <br /> <br />.~~ <br /> <br />, <br /> <br />. . <br />