My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER STORAGE PROJECT <br /> <br />. <br /> <br />FLORIDA PARTICIPATING PROJECT <br /> <br />LOCATION: <br /> <br />Near Durango, La Plata County, Southwest Colorado, ill <br />San Juan Basin of Upper Colorado River Basin. <br /> <br />AUTHORIZED: <br /> <br />As a participating project with the Colorado River Storage <br />project by Act of April 11, 1956 (70 Stat. 105). <br /> <br />PLAN: <br /> <br />. <br /> <br />Lemon Reservoir on Florida River will regulate the flow of the river <br />for irrigation of 19,450 acres of land, including 5,730 acres not <br />previously irrigated and 13,720 acres in need of supplemental water. ' <br />Regulated releases will be made from the reservoir to the Florida <br />River. A minor part of the released water will be diverted by <br />numerous small ditches that now serve lands in the narrow 25....mile <br />long river valley below the reservoir. A major part of the released <br />water will be diverted through the existing Florida Canal and the <br />Florida Farmers Ditch to lands on Florida Mesa. The diversion dam <br />for the Florida Farmers Ditch will be replaced and the upper 4.9 <br />miles of the ditch above its intersection with the Florida Canal will <br />be enlarged. Below the intersection the Florida Canal will be <br />enlarged for a distance of 1.8 miles and beyond this enlargement <br />a new lateral system will be provided to serve about 2,210 acres <br />of land. Except for this new lateral system, existing laterals will <br />distribute all project water with minor rehabilitations and e~en$ions <br />being made to serve about 3,520 acres in scattered tracts 01'\ Florida <br />Mesa. A fish screen will be installed near the head of the Florida <br />Farmers Ditch. No proj ect land drains will be required. Proj ect <br />irrigators are willing to correct inefficient irrigation practices under <br />prior water rights to conserve water for project development. ' All <br />project lands are privately owned except 785 acres of full irriga- <br />tion service land that is in Indian ownership or allotments. <br /> <br />Two recreational areas will be developed near the Lemon Reservoir. <br />The reservoir will also provide flood control benefits, will improve <br />conditions for fish, and will increase recreational use of the'nearby <br />San Juan National Forest. <br /> <br />COSTS <br /> <br />. <br /> <br />Construotion cO,$ts <br />Basin Fund .'I)ection 5 (April 1959 prices) <br />Lemol') Dam and Reservoir <br />Florida Farmers Ditch Diversion Dam <br />Florida Farmers Ditch enlargement <br /> <br />$ 9,5571009 <br />200,000 <br />450,000 <br /> <br />-40- <br />
The URL can be used to link to this page
Your browser does not support the video tag.